Heizzentrale Schulcampus Zell-Weierbach, Gebäudeautomation
Germany · Offenburg · how to bid here →
Your path to submission
- Deadline: 22 October at 10:00 — 19 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: DEU.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 3 months (116 awards, most recently September 2026) — the next award is due around December 2026 by that rhythm. The last award went to Schreinerei NESS.n = 116
- 47% of this buyer's awards went to companies that had already won here before (274 awards since 2019, spread over 144 companies). 53% went to new names.n = 274 awards since 2019
- The median procedure drew 3 bids (273 procedures with a bid count); 34% ended with a single bidder. Sector: median 4 bids.n = 273
- Across 15 procedures with structured selection criteria, this buyer most often required: References: works (13 of 15), Minimum annual turnover (13 of 15), Minimum annual headcount (13 of 15), Equipment, plant and technical facilities (12 of 15).n = 15
- Not one of the 274 awards with a known winner country has gone to a foreign company so far. Sector average: 0%.n = 274
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 02/10/2026.
Foreign bidders
In Germany · Construction work, 668 contracts went to foreign companies over the last 3 years (of 241,570 recorded awards) — mostly from Austria, France, Poland.
Submission language: DEU.
Typical field: median 3 (from 136 awards).
What the buyer is looking for
Central heating school campus Zell-Weierbach, building automation: KG 480 Building automation KG 481 12 x sensors 1 x counter 1 x control valve 1x automation station DDC approx. 110 data points KG 482 Control cabinets 1 x control cabinet with 2 fields 1 x touch control panel 1 x local priority control (LVB) KG 483 Switching the heating center to the existing MBE control technology of the city. Extension Software of the MBE Transfer of the EDE file to the installer of the MBE Common data point test between MBE and automation.
What you must prove — eligibility criteria
Bestätigung, dass kein Insolvenzverfahren o. vgl. Verfahren eröffnet wurde. Bestätigung, dass sich das Unternehmen nicht in Liquidation befindet, Bestätigungen, dass keine schweren Verfehlungen begangen wurden, Bestätigung, dass Steuern, Abgaben und Beiträge z… ▸▾
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Zink Ingenieure GmbH · Lauf | 9 | 2024–2026 |
| Fliesen Röhlich GmbH | 7 | 2016–2026 |
| Albert Ziegler GmbH | 5 | 2017–2025 |
| Werndl GmbH, Neutrale Planung der Haustechnik | 5 | 2023–2025 |
| Vogel Bau GmbH | 5 | 2025–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.