Alternative quarters, Dietrich-Bonhoeffer-Weg 1 Heating technology
Ausweichquartier, Dietrich-Bonhoeffer-Weg 1 Heizungstechnik
Germany · Wuppertal · how to bid here →
Your path to submission
- Deadline: 20 October at 08:00 — 13 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: DEU.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 5 months (151 awards, most recently August 2026) — the next award is due around January 2027 by that rhythm. The last award went to Anlagenbau Faßhauer GmbH.n = 151
- 45% of this buyer's awards went to companies that had already won here before (352 awards since 2017, spread over 192 companies). 55% went to new names.n = 352 awards since 2017
- From notice to award takes a median 216 days here (16 procedures). Sector: 87 days.n = 16
- The median procedure drew 4 bids (278 procedures with a bid count); 14% ended with a single bidder. Sector: median 4 bids.n = 278
- The award came in at a median 84% of the estimated value (26 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 89%.n = 26
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Germany · Construction work, 672 contracts went to foreign companies over the last 3 years (of 242,267 recorded awards) — mostly from Austria, Poland, France.
Submission language: DEU.
Typical field: median 4 (from 149 awards).
What the buyer is looking for
Heating technology - New installation of a heating supply for changing room. In addition to the production of the heating systems, the optional commissioning of maintenance services is part of this tender. In addition to the prices for the main services, the prices for the maintenance service must be entered by the tenderers in the schedule of services and will be included in the tender evaluation. The maintenance services can be requested optionally as required by the customer, at the latest at the time of acceptance of the manufactured system. The term of the maintenance contract is 5 years from acceptance. There is no obligation on the part of the client to use the option. This means that the future contractor has no legal claim to the retrieval of the maintenance services, but is obliged to provide the maintenance service when the option is used by the customer. With surcharge, the…
Show full description
… option right becomes part of the contract. The exercise of the option right by the client does not constitute a new order in the legal sense. Further information on the maintenance services and the associated framework conditions can be found in the attached maintenance contract as well as in the procurement and contract documents. Further information on the maintenance services and the associated framework conditions can be found in the attached maintenance contract and the procurement documents.
What you must prove — eligibility criteria
Mit dem Angebot muss eingereicht werden • die vollständig ausgefüllte Bietererklärung mit allen darin geforderten Eigenerklärungen (u.a zur Eintragung in ein Präqualifizierungsverzeichnis, zur Leistungsausführung im eigenen Betrieb und / oder durch Nachunterne… ▸▾
Von Bietern, deren Angebote in die engere Wahl kommen, sind auf Anforderung des Auftraggebers innerhalb von 6 Kalendertagen beginnend mit dem Tag nach der Absendung dieser Anforderung folgende Eigenerklärungen und Nachweise (bei Bietergemeinschaften für jedes … ▸▾
Von Bietern, deren Angebote in die engere Wahl kommen, sind auf Anforderung des Auftraggebers innerhalb von 6 Kalendertagen beginnend mit dem Tag nach der Absendung dieser Anforderung folgende Eigenerklärungen und Nachweise (bei Bietergemeinschaften für jedes … ▸▾
Mindestanforderung an die Referenz: Vorlage von mindestens 1 Referenz, die folgende Anforderungen erfüllt/erfüllen: - Bei dem Referenzauftrag handelt es sich um die Bauausführung im Bereich Heizungstechnik bei der Installationen von Wärmeerzeugern, Rohrleitung… ▸▾
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| SDH Bau GmbH · Dortmund | 7 | 2025–2026 |
| Gotthilf Benz Turngerätefabrik GmbH & Co. KG · Winnenden | 6 | 2025 |
| Vennes Erd- u. Tiefbau, Abbruch · Ratingen | 6 | 2025 |
| Kempen Krause Ingenieure GmbH | 6 | 2025 |
| BINZ Ambulance- und Umwelttechnik GmbH | 5 | 2025–2026 |
How often this buyer tenders this