Beschaffung Multifunktionsgerät als Ersatz für einen Bohrwagen
Germany · Peine · how to bid here →
Your path to submission
- Deadline: 19 October at 11:00 — 15 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: DEU.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 3 months (28 awards, most recently September 2026) — the next award is due around December 2026 by that rhythm. The last award went to MSB GmbH & Co. KG.n = 28
- 29% of this buyer's awards went to companies that had already won here before (408 awards since 2011, spread over 287 companies). That is well below the sector norm (48%) — this buyer switches suppliers more often than others.n = 408 awards since 2011
- The award came in at a median 89% of the estimated value (36 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 109%.n = 36
- From notice to award takes a median 401 days here (110 procedures). Sector: 64 days.n = 110
- The median procedure drew 2 bids (391 procedures with a bid count); 40% ended with a single bidder. Sector: median 3 bids.n = 391
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 03/10/2026.
Foreign bidders
In Germany · Mining & construction machinery, 13 contracts went to foreign companies over the last 3 years (of 1,846 recorded awards).
Submission language: DEU.
Typical field: median 1 (from 27 awards).
What the buyer is looking for
A self-propelled multifunctional machine with a wired, electric drive is to be procured for carrying out mining activities such as robbery, reworking of line contours, drilling of boreholes and anchor holes, as well as loading piles. Due to the local conditions, a crawler chassis with a rubber chain is necessary for underground travel. To ensure safety at the workplace, the machine should have 4 hydraulically controlled support feet. The complete control of all functions should be carried out by means of radio remote control. The required working power is defined by the electric motor power and the volume of the hydraulic system. The machine shall be able to pass through narrow areas with a maximum dimensions of 1.8 x 2.1 m (width x height). The following attachments including a quick-change system should be included in the scope of delivery of the multifunction device: • Hydraulic…
Show full description
… hammer with pointed chisel • Head for working rock salt and anhydrite • Loading bucket (0.25 m ³) • Adapter plates for mech. and hydr. The mobile machine must be compatible with the 690 V AC IT network (3P+PE) without having to use a separate transformer. The connecting cable of the machine must be approved for mining. Earth leakage monitoring shall be provided with an optical display on the vehicle. The mobile machine is designed to comply with the current state of the art in terms of design and technology as well as current laws and standards. With appropriate special / additional equipment, such as additional work lights, protective covers for hydraulic and electrical components as well as a mining approved (BuT) and located on the vehicle 10 kg fire extinguisher, the machine is to be adapted by the AN to the underground requirements.
What you must prove — eligibility criteria
- Angaben zu Arbeitskräften - Angabe zu Insolvenzverfahren und Liquidation - Angabe, dass nachweislich keine schwere Verfehlung begangen wurde, die die Zuverlässigkeit als Bewerber in Frage stellt - Angaben zur Zahlung von Steuern, Abgaben und Beiträgen zur ge… ▸▾
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| HUBTEX Maschinenbau GmbH & Co. KG · Fulda | 13 | 1994–2026 |
| Brenk Systemplanung GmbH · Aachen | 7 | 2021–2025 |
| Hermann Paus Maschinenfabrik GmbH · Emsbüren | 7 | 2021–2025 |
| FELUWA Pumpen GmbH · Mürlenbach | 5 | 2022–2025 |
| ZPP Ingenieure AG · Bochum | 4 | 2019–2024 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.