Grundleitungssanierung (KG 410)
Germany · Hamburg · how to bid here →
Your path to submission
- Deadline: 19 October at 14:00 — 16 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: DEU.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every month (559 awards, most recently September 2026) — the next award is due around October 2026 by that rhythm. The last award went to drs Weltring GmbH.n = 559
- The award came in at a median 38% of the estimated value (24 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 89%.n = 24
- 41% of this buyer's awards went to companies that had already won here before (895 awards since 2017, spread over 524 companies). 59% went to new names.n = 895 awards since 2017
- The median procedure drew 3 bids (885 procedures with a bid count); 25% ended with a single bidder. Sector: median 4 bids.n = 885
- 75% of the bids received came from small and medium-sized enterprises (9 procedures with a bid mix). Sector: 87%.n = 9
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 02/10/2026.
Foreign bidders
In Germany · Construction work, 668 contracts went to foreign companies over the last 3 years (of 241,570 recorded awards) — mostly from Austria, France, Poland.
Submission language: DEU.
Typical field: median 3 (from 569 awards).
What the buyer is looking for
The Museum of Hamburg History at Holstenwall 24 in Hamburg was built between 1914 and 1922 and is a listed building. As part of the current construction project, the exhibition areas will be fundamentally renovated and restructured, as well as the technical building equipment will be renewed. The building includes the following main uses: Low ground floor: Functional and storage areas, workshops, restoration rooms, office space, depots, kitchen and technical areas (heating/cold, air conditioning, plumbing, electrical). // Ground floor: Areas for special and temporary exhibitions, gastronomy with kitchen, foyer, shop and event area.//1. and 2. Upper floor: Areas for exhibitions as well as administrative rooms //attic floor: Further exhibition areas, administrative areas, storage and workshop rooms. The construction takes place over two construction phases. KG 410 Basic line refurbishment:…
Show full description
… As part of the construction project, the existing land drainage system must be comprehensively renovated. Dewatering continues in the separation system for dirt and rainwater. Due to detected damage and leaks to the examined pipes, a renovation of the land drainage system is necessary. The measure includes the rehabilitation of the dirt and rainwater sewers inside and outside the building, including the underground pipes running under the floor slab and the associated shafts. The refurbishment is mainly carried out in a closed design by means of a hose liner process. In order to carry out the work, openings of the floor slab and the production of excavations are required at selected points in order to provide the necessary access to the pipes. In addition, inspection openings are manufactured in fall lines. In the outdoor area, the refurbishment of the basic pipes is mainly carried out via existing shafts and rainpipes. In the area of the inner courtyard, additional civil engineering work is required in order to be able to rehabilitate the pipes in the inlet area of the pumping station. In addition, existing shafts are repaired, the channel is renewed and the shaft walls are refurbished. The services include all necessary preparatory work, refurbishment work including all materials as well as the necessary leakage and quality certificates. The execution is carried out in close coordination with the participating TGA trades and the building construction. Coordination services are part of the tendered services. Specific framework conditions: - Works inside and outside the existing building - Production of temporary accessibility by opening of floor slabs and construction of excavations - Execution in open and closed construction - Coordination with parallel construction, building construction and TGA trades - Proof of tightness and proper execution of the refurbishment measures - Remediation of sewage and rainwater ground pipes by means of a hose liner method - Remediation of the pipes below the floor slab - Remediation of the land drainage pipes in the outdoor area - Production of inspection openings on fall pipes - Opening of floor slabs and production of necessary excavations - Renewal of shaft gutters - Repair and rehabilitation of shafts - Performance of leak tests and documentation of the services carried out - Coordination of work with the adjacent trades Individual deadlines for completion of construction section 1 (inside): by 28.02.2027 at the latest, construction section 2 (outside): no later than 29.02.2028 individual deadlines for the start of execution of individual services at the place of performance - construction section 1 (internal): no later than 15.11.2026
What you must prove — eligibility criteria
Zur Bestätigung der Eigenerklärung sind die gem. Nr. 5 des Formulars „VV-Bau Anlage 6-020“ Anlage zur Ausschreibungsinformation –VOB – geforderten Nachweise/Angaben/Unterlagen vorzulegen. Angaben zu Insolvenzverfahren und Liquidation – gem. Auslobungsunterlage… ▸▾
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Industrial Arts GmbH | 11 | 2024–2026 |
| VAC Projects | 9 | 2024–2025 |
| MELK GmbH · Griesheim | 9 | 2024–2025 |
| IPH, Ingenieur + Planungsbüro für Haustechnik GmbH | 8 | 2024–2026 |
| Kunz & Petersen Sanitär-u. Dachdeckerei GmbH | 8 | 2020–2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.