"Šurany Electrical Station" - engineering and design activities
"Elektrická stanica Šurany" - inžinierska a projektová činnosť
Slovakia · Bratislava · how to bid here →
Your path to submission
- Deadline: 20 October at 10:00 — 17 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: SLK.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- 21% of this buyer's awards went to companies that had already won here before (69 awards since 2018, spread over 15 companies). That is well below the sector norm (35%) — this buyer switches suppliers more often than others.n = 69 awards since 2018
- 53% of the bids received came from small and medium-sized enterprises (29 procedures with a bid mix). Sector: 97%.n = 29
- 32% of awards went to companies from abroad (69 awards with a known winner country). Sector average: 13%.n = 69
- The award came in at a median 99% of the estimated value (13 awards with both estimate and value) — pricing at the estimate is usually about right here. Sector: 78%.n = 13
- The median procedure drew 4 bids (65 procedures with a bid count); 14% ended with a single bidder. Sector: median 4 bids.n = 65
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.
Foreign bidders
In Slovakia · Architecture & engineering, 25 contracts went to foreign companies over the last 3 years (of 753 recorded awards) — mostly from Czechia, Germany, Sweden.
Submission language: SLK.
Typical field: median 4 (from 758 awards).
What the buyer is looking for
The subject of performance of the contract is the execution of the Work for the performance of engineering and design activities of the building to the extent necessary for issuing a decision on the construction plan and building permit pursuant to Act No 25/2025 Coll., the Construction Act and amending certain acts, the drafting of documentation for the selection of the building contractor, the drafting of the construction project and its verification (verification clause), the drafting of the implementation project, the drafting of the Documentation of actual construction, the performance of professional copyright supervision, to ensure the issuing of a valid approval certificate, including the registration of the building in the CN, engineering-geological and hydrogeological works, geodetic works, coordination activities and activities to the extent necessary for works related to the…
Show full description
… implementation. Further information on the subject-matter of the contract can be found in the Works Contract (‘the FWC’), which is published at: https://sepsas.eranet.sk/#/tenderPublicDetails/1192
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in Slovak.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| VUJE, a.s. | 4 | 2024–2025 |
| LiV ELEKTRA, a.s. | 4 | 2024–2025 |
| EGEM, s. r. o. | 3 | 2024–2025 |
| Alter Energo, a.s. | 3 | 2024–2025 |
| ELCON BRATISLAVA, a.s. | 2 | 2025–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.