SKV Žilina – prepojenie vodovodu medzi obcami Turie a Višňové.
Slovakia · Žilina · how to bid here →
Your path to submission
- Deadline: 23 September at 00:00 — 4 days left.
- The submission point is stated in the notice (link on the right).
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- 0% of this buyer's awards went to companies that had already won here before (13 awards since 2018, spread over 5 companies). That is well below the sector norm (39%) — this buyer switches suppliers more often than others.n = 13 awards since 2018
- The median procedure drew 2 bids (12 procedures with a bid count); 17% ended with a single bidder. Sector: median 5 bids.n = 12
- 17% of the bids received came from other countries (6 procedures with a bid mix) — all bidders, not just the winners. Sector: 3%.n = 6
- The award came in at a median 85% of the estimated value (6 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 80%.n = 6
- 91% of the bids received came from small and medium-sized enterprises (6 procedures with a bid mix). Sector: 79%.n = 6
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 15/09/2026.
Foreign bidders
In Slovakia · Construction work, 80 contracts went to foreign companies over the last 3 years (of 1,090 recorded awards) — mostly from Germany, Czechia, Italy.
Typical field: median 5 (from 1,092 awards).
What the buyer is looking for
The summary in English is being prepared. The official description below is in the original language (DE).
Show original description (DE)
Predmetom zákazky je prepojenie zdrojov pitnej vody v oblasti obce Turie do obce Višňové. Celková dĺžka potrubia je navrhnutá 4 171,55 m. Vzhľadom k tlakovým pomerom v danej lokalite je v rámci projektu navrhnutá ATS, ktorá dopraví pitnú vodu do VDJ Višňové. Potrubie po ATS je navrhnuté ako prívodné z mat. D 160x14,6 mm, HD PE, PE 100 RC, SDR 11 v dĺžke 3056,05 m a od ATS výtlačné potrubie D 125x7,4 mm, HD PE, PE 100 RC, SDR 17 v dĺžke 1115,50 m. Úsek prívodného potrubia od obce Turie po ATS bude rozdelené na dve časti a to: 1. Etapa – od obce Turie po redukčnú šachtu pri obecnom úrade Višňové – dĺžka 1898,62 m 2. Etapa – od redukčnej šachty po ATS – dĺžka 1157,40 m.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| VodanIQ s. r. o. | 2 | 2026 |
| AB Project, s.r.o. | 1 | 2025 |
| Try More, s.r.o. | 1 | 2026 |
| HYDROEKOL, s.r.o. | 1 | 2026 |
| AERZEN SLOVAKIA s.r.o. | 1 | 2025 |