N59 Oughterard Footbridge
Ireland · Galway · how to bid here →
Your path to submission
- Deadline: 5 October at 00:00 — 16 days left.
- The submission point is stated in the notice (link on the right).
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 3 months (9 awards, most recently December 2025) — by that rhythm the next award was due around March 2026. The last award went to Ward and Burke Construction Ltd..n = 9
- 24% of this buyer's awards went to companies that had already won here before (153 awards since 2013, spread over 96 companies). That is well below the sector norm (52%) — this buyer switches suppliers more often than others.n = 153 awards since 2013
- The median procedure drew 4 bids (143 procedures with a bid count); 17% ended with a single bidder. Sector: median 5 bids.n = 143
- 4% of awards went to companies from abroad (153 awards with a known winner country). Sector average: 2%.n = 153
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 13/09/2026.
Foreign bidders
In Ireland · Construction work, 113 contracts went to foreign companies over the last 3 years (of 4,990 recorded awards) — mostly from United Kingdom, Greece, Germany.
Typical field: median 4 (from 9 awards).
What the buyer is looking for
The summary in English is being prepared. The official description below is in the original language (DE).
Show original description (DE)
Construction of steel footbridge over the Owenriff River and associated works, including access ramp and track, masonry boundary walls, parapet railings, lighting, pedestrian crossings, services diversions and tree planting.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| MANNION BUILD | 5 | 2016–2025 |
| C and N Higgins Construction ltd | 4 | 2020–2022 |
| Hassett Leyden and Associates | 4 | 2021–2023 |
| Finna Construction Ltd | 3 | 2020–2023 |
| PUNCH Consulting Engineers | 3 | 2017–2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.