Sanierung Tonnenleger Kapitän Meyer
Germany · Wilhelmshaven · how to bid here →
Your path to submission
- Deadline: 15 October at 00:00 — 26 days left.
- The submission point is stated in the notice (link on the right).
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- 54% of this buyer's awards went to companies that had already won here before (382 awards since 2019, spread over 177 companies). 46% went to new names.n = 382 awards since 2019
- 100% of the bids received came from small and medium-sized enterprises (10 procedures with a bid mix). Sector: 66%.n = 10
- The median procedure drew 3 bids (379 procedures with a bid count); 30% ended with a single bidder. Sector: median 2 bids.n = 379
- The award came in at a median 84% of the estimated value (77 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 81%.n = 77
- Across 16 procedures with structured selection criteria, this buyer most often required: References: services (1 of 16), Staff qualifications (1 of 16), Trade register enrolment (1 of 16).n = 16
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 13/09/2026.
Foreign bidders
In Germany · Repair & maintenance, 74 contracts went to foreign companies over the last 3 years (of 12,641 recorded awards) — mostly from Austria, Netherlands, Poland.
Typical field: median 2 (from 3 awards).
What the buyer is looking for
The summary in English is being prepared. The official description below is in the original language (DE).
Show original description (DE)
LV 1 - Instandsetzung Schiffsrumpf und Aufbauten mit Einrichtung LV 2 - Umbau Das entwickelte Nutzungskonzept vom Tonnenleger KAPITÄN MEYER sieht eine umfangreiche und denkmalgerechte Instandsetzung sowie einen gezielten Umbau vor, um es zukünftig im Museumshafen am Bontekai als stationäres Museums- und Eventschiff unter dem Dach des Küstenmuseums zu betreiben Aktueller Liegeplatz des Schiffes: Marinearsenal Wilhelmshaven, Bauhafen, Gökerstraße Tor 1, 26382 Wilhelmshaven
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Raumausstatter Ricklefs · Wilhelmshaven | 11 | 2024–2025 |
| Nietiedt Gerüstbau GmbH | 7 | 2024–2026 |
| Siefken & Hollmann Metallbau GmbH · Wilhelmshaven | 7 | 2024–2025 |
| Tischlerei Frerk Schulte GmbH · Saterland | 6 | 2024–2025 |
| Thalen Grundstücksgesellschaft mbH · Neuenburg | 6 | 2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.