- Deadline: 27 October at 00:00 — 38 days left.
- The submission point is stated in the notice (link on the right).
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (460 awards, most recently May 2026) — by that rhythm the next award was due around July 2026. The last award went to HoGaKa Profi GmbH.n = 460
- 15% of this buyer's awards went to companies that had already won here before (500 awards since 2017, spread over 423 companies). That is well below the sector norm (40%) — this buyer switches suppliers more often than others.n = 500 awards since 2017
- From notice to award takes a median 509 days here (352 procedures). Sector: 87 days.n = 352
- The award came in at a median 100% of the estimated value (6 awards with both estimate and value) — pricing at the estimate is usually about right here. Sector: 89%.n = 6
- The median procedure drew 4 bids (482 procedures with a bid count); 19% ended with a single bidder. Sector: median 4 bids.n = 482
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 13/09/2026.
Foreign bidders
In Germany · Construction work, 660 contracts went to foreign companies over the last 3 years (of 240,202 recorded awards) — mostly from Austria, France, Poland.
Typical field: median 3 (from 468 awards).
What the buyer is looking for
The summary in English is being prepared. The official description below is in the original language (DE).
Show original description (DE)
Ausgeschrieben werden:•Regelung mit Aufschaltung auf Zentralregler in der Heizzentrale•Heizungsverteiler für 2 Heizkreise•2 St. Heizkreise komplett DN 40 / DN 25•ca. 8 St. Armaturen•ca. 850 m² Fußbodenheizung mit Thermoleitblechen•5 St. Heizkreisverteiler•ca. 320 m Edelstahlrohr, gepresst DN 15 – DN 50•Brandschutzabschottungen•Kernbohrungen•Nebenarbeiten•Demontagearbeiten•Wartungsvertrag
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Licht-, Kraft- und Wasserwerke Kitzingen GmbH · Kitzingen | 8 | 2015–2025 |
| Weipert GmbH | 7 | 2025 |
| Stolz Hoch- und Ingenieurbau GmbH | 4 | 2025 |
| Holzbau Rößner gmbH · Dettelbach-Euerfeld | 4 | 2025 |
| Grötsch Energietechnik GmbH | 4 | 2017–2024 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.