Preparation of design documentation for the construction of multi-residential buildings at the location Zagreb, Resnik
Izrada projektne dokumentacije za izgradnju višestambenih građevina na lokaciji Zagreb, Resnik
Croatia · Grad Zagreb · how to bid here →
Your path to submission
- Deadline: 29 October at 00:00 — 41 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: HRV.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (81 awards, most recently August 2026) — the next award is due around October 2026 by that rhythm. The last award went to ENERGONOVA d.o.o..n = 81
- The award came in at a median 111% of the estimated value (177 awards with both estimate and value) — pricing at the estimate is usually too low here. Sector: 55%.n = 177
- 69% of this buyer's awards went to companies that had already won here before (377 awards since 2017, spread over 105 companies). That is well above the sector norm (55%) — newcomers have a harder time here than elsewhere.n = 377 awards since 2017
- The median procedure drew 2 bids (100 procedures with a bid count); 30% ended with a single bidder. Sector: median 3 bids.n = 100
- 1% of the bids received came from other countries (90 procedures with a bid mix) — all bidders, not just the winners. Sector: 11%.n = 90
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 13/09/2026.
Foreign bidders
In Croatia · Architecture & engineering, 21 contracts went to foreign companies over the last 3 years (of 2,052 recorded awards) — mostly from Germany, Spain, Austria.
Typical field: median 2 (from 81 awards).
What the buyer is looking for
The summary in English is being prepared. The official description below is in the original language (DE).
Show original description (DE)
Usluge izrade projektne dokumentacije za izgradnju „stambenog naselja“ na k.č.br. 1916/1 k.o. Resnik, 1916/2 k.o. Resnik i 1916/3 k.o. Resnik, za potrebe provedbe Zakona o priuštivom stanovanju.
What you must prove — eligibility criteria
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Konektor-Split d.o.o. | 20 | 2018–2025 |
| ENERGONOVA d.o.o. | 20 | 2018–2026 |
| NEOS d.o.o. | 14 | 2024–2025 |
| GIN Company d.o.o. | 13 | 2019–2023 |
| CROATIA osiguranje d.d. | 12 | 2020–2024 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.