Reconstruction of AB Hall
Přestavba objektu AB hala
Czechia · Praha · how to bid here →
Your path to submission
- Deadline: 25 September at 00:00 — 7 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: CES, SLK.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 3 months (15 awards, most recently June 2026) — the next award is due around September 2026 by that rhythm. The last award went to Stavby 3S s.r.o..n = 15
- The median procedure drew 2 bids (907 procedures with a bid count); 43% ended with a single bidder. Sector: median 5 bids.n = 907
- 70% of this buyer's awards went to companies that had already won here before (939 awards since 2022, spread over 251 companies). 30% went to new names.n = 939 awards since 2022
- The award came in at a median 71% of the estimated value (113 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 82%.n = 113
- 6% of awards went to companies from abroad (939 awards with a known winner country). Sector average: 8%.n = 939
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 17/09/2026.
Foreign bidders
In Czechia · Construction work, 136 contracts went to foreign companies over the last 3 years (of 16,086 recorded awards) — mostly from Germany, Poland, France.
Typical field: median 2 (from 15 awards).
What the buyer is looking for
The summary in English is being prepared. The official description below is in the original language (DE).
Show original description (DE)
Předmětem veřejné zakázky je realizace stavebních prací spočívajících v přestavbě stávajících prostor objektu AB-hala, a to včetně všech souvisejících stavebních a dokončovacích prací v rozsahu stanoveném projektovou dokumentací.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in CES, SLK.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| AVE Pražské komunální služby a.s. | 29 | 2023–2026 |
| RAUDO - výrobní družstvo invalidů | 26 | 2024–2026 |
| Purum s.r.o. | 26 | 2023–2026 |
| FCC Česká republika, s.r.o. | 26 | 2023–2026 |
| IPODEC - ČISTÉ MĚSTO a.s. | 14 | 2023–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.