(ProVia-ID 160261) Stockerau - Retz; selective 2-track expansion; EIA impact factor assessment noise, air, light, EIA specialist report air/climate, EIA specialist report climate-energy concept
(ProVia-ID 160261) Stockerau - Retz; selektiv 2-gleisiger Ausbau; UVE-Wirkfaktorb. Lärm, Luft, Licht, UVE-FB Luft/Klima, UVE-FB Klima-Energiekonzept
Austria · Wien · how to bid here →
Your path to submission
- Deadline: 7 October at 14:00 — 4 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: DEU.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (282 awards, most recently September 2026) — the next award is due around November 2026 by that rhythm. The last award went to EMR Ingenieurbüro für Elektrotechnik.n = 282
- 28% of this buyer's awards went to companies that had already won here before (1,761 awards since 2015, spread over 583 companies). 72% went to new names.n = 1,761 awards since 2015
- The median procedure drew 3 bids (1,201 procedures with a bid count); 26% ended with a single bidder. Sector: median 4 bids.n = 1,201
- 28% of awards went to companies from abroad (1,761 awards with a known winner country). Sector average: 16%.n = 1,761
- 60% of the bids received came from small and medium-sized enterprises (193 procedures with a bid mix). Sector: 80%.n = 193
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/10/2026.
Foreign bidders
In Austria · Architecture & engineering, 409 contracts went to foreign companies over the last 3 years (of 2,797 recorded awards) — mostly from Germany, Italy, Poland.
Typical field: median 2 (from 234 awards).
What the buyer is looking for
The present procedure includes the award of the service preparation of the effect factor report noise, preparation of the effect factor report light/glare/shading, preparation of the effect factor report air pollutants and preparation of the protective goods-related technical contributions air and climate climate energy concept in the course of the preparation of a submission project in accordance with UVP-G (Environmental Impact Assessment Act) as amended in the context of a fully concentrated procedure for the project ‘Stockerau - Retz; selective 2-track extension’. In addition, the OPTIONAL procedure in question includes the installation, operation and evaluation of a climate and air quality measuring station as well as support during the detailed planning phase.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in German.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| PORR Bau GmbH · 8141 AT | 29 | 2022–2026 |
| Swietelsky AG | 27 | 2022–2026 |
| European Trans Energy GmbH · Wien | 21 | 2022–2026 |
| STRABAG AG | 19 | 2022–2026 |
| Siemens Mobility Austria GmbH | 16 | 2022–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.