Engineering Consultancy Services for the Ardmore Road to N52 IDA Baltrasna Roundabout Link Road, Mullingar, Co. Westmeath.
Ireland · Mullingar · how to bid here →
Your path to submission
- Deadline: 21 October at 00:00 — 33 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: ENG.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (79 awards, most recently July 2026) — the next award is due around September 2026 by that rhythm. The last award went to Gildea Chartered Quantity Surveyors.n = 79
- 28% of this buyer's awards went to companies that had already won here before (340 awards since 2013, spread over 219 companies). That is well below the sector norm (45%) — this buyer switches suppliers more often than others.n = 340 awards since 2013
- The median procedure drew 7 bids (314 procedures with a bid count); 15% ended with a single bidder. Sector: median 6 bids.n = 314
- 2% of awards went to companies from abroad (340 awards with a known winner country). Sector average: 7%.n = 340
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 13/09/2026.
Foreign bidders
In Ireland · Architecture & engineering, 271 contracts went to foreign companies over the last 3 years (of 4,567 recorded awards) — mostly from United Kingdom, Spain, France.
Typical field: median 18 (from 75 awards).
What the buyer is looking for
The summary in English is being prepared. The official description below is in the original language (DE).
Show original description (DE)
Engineering Consultancy Services for the Ardmore Road to N52 IDA Baltrasna Roundabout Link Road, Mullingar, Co. Westmeath.
Selection criteria — via the ESPD
The buyer states in the notice that eligibility is proven through the European Single Procurement Document (ESPD); the concrete requirements are in the tender documents. The document analysis below extracts them from there — bid and evidence in ENG.
Eligibility analysis from the tender documents
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| TOBIN Consulting Engineers | 5 | 2017–2023 |
| Michael Bracken and sons ltd | 5 | 2023–2025 |
| Cooney Architects Ltd | 4 | 2024–2025 |
| Owenbee Services Ltd | 4 | 2014–2024 |
| TRIUR Construction Limited | 4 | 2017–2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.