Sole work on PWN distribution pipelines with 24/7 emergency service
Solo werkzaamheden distributieleidingen PWN met 24/7 storingsdienst
Netherlands · Velserbroek · how to bid here →
Your path to submission
- Deadline: 13 November at 00:00 — 56 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: NLD, NLD, NLD, NLD.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- 5% of this buyer's awards went to companies that had already won here before (20 awards since 2024, spread over 19 companies). That is well below the sector norm (18%) — this buyer switches suppliers more often than others.n = 20 awards since 2024
- The median procedure drew 3 bids (17 procedures with a bid count); 6% ended with a single bidder. Sector: median 4 bids.n = 17
- Not one of the 20 awards with a known winner country has gone to a foreign company so far. Sector average: 2%.n = 20
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 13/09/2026.
Foreign bidders
In Netherlands · Construction work, 31 contracts went to foreign companies over the last 3 years (of 2,367 recorded awards) — mostly from Belgium, Germany, Italy.
Typical field: median 4 (from 1,917 awards).
What the buyer is looking for
The summary in English is being prepared. The official description below is in the original language (DE).
Show original description (DE)
De werkzaamheden van PWN die onderdeel uitmaken van de scope van de aan te besteden opdracht betreft de volgende werkstromen: - Engineering leidingen; - Reconstructie van hoofdleidingen en eventueel aansluitingen; - Sanering van hoofdleidingen en eventueel aansluitingen; - Solo aansluitingen; - Storingen incl. een 24/7 storingsdienst met een maximale opkomsttijd van 90 minuten; - Reparaties; - Assistentie bij netdruk beproeving.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in NLD, NLD, NLD, NLD.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Van Baarsen Buisleidingen B.V. | 2 | 2024–2025 |
| ARP Nederland BV | 1 | 2024 |
| AVK Nederland B.V. | 1 | 2025 |
| Batenburg Digit B.V. | 1 | 2024 |
| CLOUDOE B.V. | 1 | 2024 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.