Parking Pressure Study and Signage and Parking Meter Plan
Parkeerdrukonderzoek en bebordings- en automatenplan
Netherlands · Nijmegen · how to bid here →
Your path to submission
- Deadline: 30 October at 00:00 — 42 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: NLD.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- The median procedure drew 25 bids (191 procedures with a bid count); 9% ended with a single bidder. Sector: median 4 bids.n = 191
- 15% of this buyer's awards went to companies that had already won here before (215 awards since 2015, spread over 156 companies). 85% went to new names.n = 215 awards since 2015
- 54% of the bids received came from small and medium-sized enterprises (18 procedures with a bid mix). Sector: 37%.n = 18
- 2% of awards went to companies from abroad (215 awards with a known winner country). Sector average: 4%.n = 215
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 13/09/2026.
Foreign bidders
In Netherlands · Other services, 8 contracts went to foreign companies over the last 3 years (of 356 recorded awards).
Typical field: median 4 (from 273 awards).
What the buyer is looking for
The summary in English is being prepared. The official description below is in the original language (DE).
Show original description (DE)
Het doel van deze aanbesteding is het sluiten van een raamovereenkomst met één opdrachtnemer voor het uitvoeren van parkeerdrukonderzoeken en het opstellen van bebordings- en parkeerautomatenplannen. De beoogde ingangsdatum van de raamovereenkomst is 1 januari 2027.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in NLD.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Modderkolk Projects & Maintenance B.V. | 3 | 2024–2026 |
| Onder de Bomen B.V. | 3 | 2024–2025 |
| Prolis B.V. | 3 | 2024–2025 |
| UniK B.V. | 3 | 2024–2025 |
| Stichting IrisZorg | 3 | 2024–2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.