Framework Agreement Engineering Services CWO
Raamovereenkomst Ingenieursdiensten GWW
Netherlands · Delft · how to bid here →
Your path to submission
- Deadline: 6 October at 10:00 — 3 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: NLD.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 4 months (11 awards, most recently August 2025) — by that rhythm the next award was due around December 2025. The last award went to BK Ingenieurs.n = 11
- 0% of this buyer's awards went to companies that had already won here before (498 awards since 2015, spread over 47 companies). That is well below the sector norm (12%) — this buyer switches suppliers more often than others.n = 498 awards since 2015
- The award came in at a median 112% of the estimated value (8 awards with both estimate and value) — pricing at the estimate is usually too low here. Sector: 90%.n = 8
- 72% of the bids received came from small and medium-sized enterprises (10 procedures with a bid mix). Sector: 41%.n = 10
- The median procedure drew 4 bids (421 procedures with a bid count); 11% ended with a single bidder. Sector: median 5 bids.n = 421
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 02/10/2026.
Foreign bidders
In Netherlands · Architecture & engineering, 128 contracts went to foreign companies over the last 3 years (of 2,665 recorded awards) — mostly from Germany, France, United Kingdom.
Typical field: median 8 (from 10 awards).
What the buyer is looking for
The summary in English is being prepared. The official description below is in the original language (NL).
Show original description (NL)
Raamovereenkomst Ingenieursdiensten GWW voor de gemeenten Delft en Rijswijk.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in Dutch.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| BK Ingenieurs | 2 | 2025 |
| Aannemingsbedrijf G. van der Ven B.V. | 1 | 2024 |
| Medipoint WMO B.V. | 1 | 2023 |
| Iv-Infra B.V. | 1 | 2024 |
| Noordzij Beschermingsbewind B.V. | 1 | 2024 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.