Replacement of Active LAN Elements
Obměna aktivních prvků LAN
Czechia · Praha · how to bid here →
Your path to submission
- Deadline: 18 September at 00:00 — 1 day left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: CES.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- 13% of this buyer's awards went to companies that had already won here before (180 awards since 2015, spread over 34 companies). That is well below the sector norm (57%) — this buyer switches suppliers more often than others.n = 180 awards since 2015
- 32% of awards went to companies from abroad (180 awards with a known winner country). Sector average: 6%.n = 180
- The median procedure drew just one bid (148 procedures with a bid count); 80% ended with a single bidder. Sector: median 2 bids.n = 148
- 13% of the bids received came from other countries (35 procedures with a bid mix) — all bidders, not just the winners. Sector: 1%.n = 35
- 94% of the bids received came from small and medium-sized enterprises (35 procedures with a bid mix). Sector: 79%.n = 35
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 13/09/2026.
Foreign bidders
In Czechia · Radio, TV & communications, 20 contracts went to foreign companies over the last 3 years (of 2,362 recorded awards) — mostly from France, Germany, Spain.
Typical field: median 2 (from 1,838 awards).
What the buyer is looking for
The subject-matter of this contract is an undertaking by the contractor: a) carry out a complete renewal of the backbone LAN infrastructure for the contracting authority at the place of performance in accordance with the Draft Contract, which includes the delivery and installation of new active elements in the contracting authority's infrastructure, the transfer of the existing configuration and commissioning together with the introduction into monitoring and the transmission of documentation, in accordance with the technical specification set out in Annex 1a to the Draft Contract (hereinafter referred to as "Goods"); provide service support to the sponsor for the performance referred to in point (a) of this paragraph, including: (ba) incident handling, (bb) configuration services, (bb) consulting services, all in accordance with Annex 2 to the Draft Contract (hereinafter referred to as…
Show full description
… ‘Service Support’). The subject of performance also includes: the transport and delivery of the Goods to the place of performance referred to in Article III(5) of the Draft Contract and their removal to the place of installation as instructed by the contracting authority; b) installation, configuration and implementation of the Goods as a functional unit into the existing infrastructure in the customer's environment, including commissioning together with implementation into monitoring, all in accordance with Annex 1a to the Draft Contract; c) handing over documents and documents related to the use of the Goods, in particular technical documentation, including documentation of parameters, configurations and settings, in Czech or English in electronic form (PDF or MS Word format); the declaration of conformity; the operational documentation; delivery notes, warranty certificates for individual components, as well as documentation pursuant to Annex 1a to the Draft Contract; d) providing the right to use those parts or components of the Goods that represent or contain copyrighted works or other intellectual property rights, to the extent specified in the Draft Contract; e) training of designated employees of the contracting authority in the number of a maximum of 5 persons in the range of a minimum of 5 working days for the operation and configuration of the Goods, including the determination of routine maintenance after signing the Implementation Protocol, and also in the number of a maximum of 5 persons in the range of 5 working days during the duration of the contract (hereinafter referred to as "operator training"). For this setting, the Supplier shall provide the Customer with an overview of the basic required control parameters; f) Examination of the functionality of the Goods by a trial operation, including the performance of acceptance tests pursuant to Article VI of the Draft Contract (hereinafter collectively also referred to as the "subject of performance"). Service support pursuant to 3.1(b) of this Contract will be provided by the Supplier for a period of 5 years from the signing of the Handover Protocol pursuant to Article VI(3) of the Draft Contract. Part of Service Support is the provision of all updates and upgrades issued by the manufacturer for the entire warranty period and for the duration of Service Support. The subject of performance is further described in more detail in the Purchase Agreement and its annexes, which form Annex No. 1 to the ZD.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in CES.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| SPM - Security Paper Mill, a.s. | 7 | 2022–2026 |
| LUX - IDent s.r.o. | 7 | 2025 |
| OVD Kinegram AG | 5 | 2015–2026 |
| Linxens (Thailand) Co., Ltd. | 5 | 2020–2026 |
| THALES DIS France SAS | 4 | 2023–2026 |