REP-extension, reconstruction, re-equipment (P.0600), construction and assembly work
REP-rozšíření, rekonstrukce, přeústění (P.0600), stavebně-montážní práce
Czechia · Praha · how to bid here →
Your path to submission
- Deadline: 25 September at 00:00 — 8 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: CES.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- 36% of this buyer's awards went to companies that had already won here before (476 awards since 2012, spread over 172 companies). That is well below the sector norm (77%) — this buyer switches suppliers more often than others.n = 476 awards since 2012
- In this sector the buyer awards roughly every 2 months (85 awards, most recently July 2026) — the next award is due around September 2026 by that rhythm. The last award went to ELCON BRATISLAVA, a.s..n = 85
- 24% of awards went to companies from abroad (476 awards with a known winner country). Sector average: 8%.n = 476
- The award came in at a median 88% of the estimated value (24 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 82%.n = 24
- The median procedure drew 5 bids (337 procedures with a bid count); 17% ended with a single bidder. Sector: median 5 bids.n = 337
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 13/09/2026.
Foreign bidders
In Czechia · Construction work, 136 contracts went to foreign companies over the last 3 years (of 16,086 recorded awards) — mostly from Germany, Poland, France.
Typical field: median 6 (from 65 awards).
What the buyer is looking for
The summary in English is being prepared. The official description below is in the original language (DE).
Show original description (DE)
Předmětem plnění veřejné zakázky jsou stavebně-montážní práce akce „REP-rozšíření, rekonstrukce, přeústění (P.0600), stavebně-montážní práce“ v rozsahu stavebních objektů (dále jen „SO“) a provozních souborů (dále jen „PS“) specifikovaných v závazném návrhu Smlouvy o dílo, jež tvoří Přílohu č. 2 Zadávací dokumentace. Předmět plnění veřejné zakázky je dále specifikován v Zadávací dokumentaci.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in CES.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Rexonix s.r.o. | 15 | 2024–2026 |
| ELSO PHILIPS SERVICE, spol. s r.o. | 10 | 2024–2025 |
| Siemens Energy, s.r.o. | 10 | 2022–2026 |
| Union Grid s.r.o. | 10 | 2024–2026 |
| SERW, spol. s r.o. | 9 | 2022–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.