VLRZ - FVE - VZ Měřín and VRÚ Slapy
VLRZ - FVE - VZ Měřín a VRÚ Slapy
Czechia · Praha 10 - Vršovice · how to bid here →
Your path to submission
- Deadline: 1 October at 00:00 — 14 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: CES.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- The median procedure drew 16 bids (305 procedures with a bid count); 8% ended with a single bidder. Sector: median 3 bids.n = 305
- 61% of this buyer's awards went to companies that had already won here before (317 awards since 2021, spread over 98 companies). That is well above the sector norm (49%) — newcomers have a harder time here than elsewhere.n = 317 awards since 2021
- 62% of the bids received came from small and medium-sized enterprises (276 procedures with a bid mix). Sector: 32%.n = 276
- The award came in at a median 80% of the estimated value (29 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 73%.n = 29
- 2% of awards went to companies from abroad (317 awards with a known winner country). Sector average: 1%.n = 317
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 13/09/2026.
Foreign bidders
In Czechia · Petroleum & fuels, 17 contracts went to foreign companies over the last 3 years (of 3,196 recorded awards).
Typical field: median 3 (from 2,393 awards).
What the buyer is looking for
The summary in English is being prepared. The official description below is in the original language (DE).
Show original description (DE)
Předmětem veřejné zakázky je zhotovení/dodávka fotovoltaické elektrárny vč. technologií a inženýrských sítí na střechách stávajících objektů Vojenské zotavovny Měřín a Vojenského rehabilitačního ústavu Slapy, jejich uvedení do provozu a zaškolení obsluhy.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in CES.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| JIP východočeská, a.s. | 23 | 2024–2026 |
| Bidfood Czech Republic s.r.o. | 23 | 2024–2026 |
| BOVYS, s.r.o. | 20 | 2025–2026 |
| PENAM, a.s. | 9 | 2025–2026 |
| MAKOVEC a.s. | 8 | 2025–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.