Friedrich & ClementBETA

Provision of energy services using the EPC method at facilities of Prague 5 Municipal District

Poskytování energetických služeb metodou EPC na objektech Městské části Praha 5

Czechia · Praha - Smíchov · how to bid here →

Your path to submission

  1. Deadline: 19 October at 09:00 — 14 days left.
  2. The submission point is stated in the notice (link on the right).
  3. Offer and evidence in: CES, SLK.
  4. Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

Clement What the numbers say about this buyer

  • 8% of this buyer's awards went to companies that had already won here before (79 awards since 2015, spread over 37 companies). That is well below the sector norm (78%) — this buyer switches suppliers more often than others.n = 79 awards since 2015
  • In this sector the buyer awards roughly every 7 months (8 awards, most recently December 2025) — by that rhythm the next award was due around July 2026. The last award went to SWIFT-Projekt s.r.o..n = 8
  • The median procedure drew 3 bids (62 procedures with a bid count); 24% ended with a single bidder. Sector: median 4 bids.n = 62
  • The award came in at a median 73% of the estimated value (12 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 76%.n = 12
  • 10% of awards went to companies from abroad (79 awards with a known winner country). Sector average: 8%.n = 79

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.

Foreign bidders

In Czechia · Architecture & engineering, 451 contracts went to foreign companies over the last 3 years (of 15,856 recorded awards) — mostly from Germany, France, Austria.

Submission language: CES.

Typical field: median 11 (from 7 awards).

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

What the buyer is looking for

The subject of this contract is the provision of energy services with a guaranteed result (operating costs savings related to the use of energy – ‘services’) for the buildings of the Prague 5 district. As part of the contract, a proposal for energy-saving measures will be prepared by the service provider. The implementation of energy-saving measures within the meaning of this contract shall include the following operations: a) preparation of project documentation and provision of other activities for securing building permits for the implementation of austerity measures if, according to the participant's offer, they are necessary with regard to the proposed measures and if the supporting documents have not been provided by the contracting authority, b) all engineering activities, in particular the processing of requirements related to obtaining a building permit, c) preparation of…

Show full description

… implementation project documentation for the implementation of austerity measures, d) delivery and installation of proposed austerity measures "turnkey", e) preparation of documentation for the actual implementation of austerity measures, f) elaboration of detailed operating rules for newly installed equipment and operator training, g) energy management (services including permanent monitoring and evaluation of achieved energy savings) for the duration of the contractual relationship, including inspection of installed equipment, h) provision of a guarantee for achieving the expected savings, i) monitoring and evaluation of achieved results for the duration of the contractual relationship. More detailed information can be found in the other parts of the Tender Specifications or in the annexes to the Tender Specifications, which are the Client's Requirements and the Binding Model Contract.

Machine translation (EU eTranslation) — official wording via the PDF link.

Selection criteria — in the procurement documents

The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in Czech, Slovak.

Contract

BuyerMěstská část Praha 5
TypeServices
Estimated valuevalue not published
Published16 September 2026
CategoryArchitecture & engineering · CPV 71314000

Who has won here before

CompanyAwardsPeriod
Pražská plynárenská, a.s.32024–2025
CENTRA a.s.22026
BBP Stavby s.r.o.22024–2025
C D V služby, s.r.o.---CENTRA a.s.22022
AXIOM REAL, spol. s r.o.22022–2026
From 18.0M documented awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this

20221
20257
20264

Who knows the rhythm prepares instead of reacting.

·
days until the deadline — Monday 19 October at 09:00

How to bid

Read the full notice — Original + documents
Goes directly to this tender on TED — Tenders Electronic Daily. The full specification and all annexes are there.

Tender documents — direct download

Specifications and annexes hosted by the buyer — usually accessible without registration.
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now →