Consulting and Technical Assistance Services during the Evaluation Period of the Financing Request and Implementation of the INTEGRATED WASTE MANAGEMENT SYSTEM IN BRAȘOV COUNTY Project
Servicii de consultanţă şi asistenţă tehnică pe perioada de evaluare a cererii de finanțare și de implementare a proiectului SISTEM DE MANAGEMENT INTEGRAT AL DEŞEURILOR ÎN JUDEŢUL BRAŞOV
Romania · Brasov · how to bid here →
Your path to submission
- Deadline: 23 September at 00:00 — 6 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: RON.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (48 awards, most recently September 2026) — the next award is due around November 2026 by that rhythm. The last award went to Topomaster surveying.n = 48
- 57% of this buyer's awards went to companies that had already won here before (667 awards since 2019, spread over 260 companies). 43% went to new names.n = 667 awards since 2019
- The median procedure drew 3 bids (228 procedures with a bid count); 17% ended with a single bidder. Sector: median 4 bids.n = 228
- 3% of awards went to companies from abroad (667 awards with a known winner country). Sector average: 0%.n = 667
- Across 11 procedures with structured selection criteria, this buyer most often required: Trade register enrolment (11 of 11), References: services (8 of 11), Independent quality certificate (e.g. ISO 9001) (5 of 11), Staff qualifications (5 of 11).n = 11
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 13/09/2026.
Foreign bidders
In Romania · Architecture & engineering, 80 contracts went to foreign companies over the last 3 years (of 87,232 recorded awards) — mostly from France, Netherlands, Italy.
Typical field: median 6 (from 5 awards).
What the buyer is looking for
Through the "Integrated Waste Management System in Braşov County" project, which will be financed through PDD, the necessary investments will be made in the short term, identified on the basis of the County Waste Management Plan, as well as other potential investments identified in the feasibility study. The expected investments will be in line with the actions supported by the SDP Guide to Priority 1 - Development of water and wastewater infrastructure and transition to a circular economy, Specific Objective RSO2.6. Promoting the transition to a resource-efficient and circular economy. The alternative chosen will have to be in line with the provisions of the County Waste Management Plan for Braşov County 2020-2025. The activities to be performed under the service contract are detailed in the tender specifications. The contracting authority will respond in a clear and complete manner to…
Show full description
… all requests for clarification on the 11th day before the date of submission of tenders, to the extent that these requests will be addressed within the deadline provided in section I.3) of the data sheet, respectively 15 days before the deadline for submission of tenders.
What you must prove — eligibility criteria
Operatorii economici (ofertanți/asociați/subcontractanți/terți susținători) ce depun oferta trebuie să dovedească o formă de înregistrare în condiţiile legii din ţara de rezidenţă, să reiasă că operatorul economic este legal constituit, că nu se află în niciun… ▸▾
Media cifrei de afaceri anuala pe ultimii trei ani financiari (2023, 2024, 2025) a ofertantului trebuie sa fie de cel putin 8.409.000 lei. 1) În cazul în care mai mulți operatori economici participă în comun la procedura de atribuire, îndeplinirea criteriilor … ▸▾
Ofertantul va prezenta un certificat emis de un organism independent care atestă că acesta are implementat, conform ISO 9001, un sistem de management al calităţii pentru activităţile care fac obiectul contractului ce urmează a fi atribuit. Certificatul trebuie… ▸▾
Ofertantul trebuie sa demonstreze că în ultimii 5 ani, împliniți la data termenului limită de depunere a ofertelor, a prestat înconformitate cu normele profesionale în domeniu și a dus la bun sfârșit servicii similare în valoare cumulată de minim 8.409.000 lei… ▸▾
Solicitarea certificatului de atestare de mediu pentru domeniul RA-11b – Infrastructura de gestionare a deseurilor - se fundamentează pe necesitatea asigurării conformității activităților proiectului cu cerințele legislației de mediu aplicabile și cu principii… ▸▾
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| ROSENAU PRESS | 36 | 2024–2026 |
| GLOBAL WORK&TRAINING COMPANY | 26 | 2024 |
| Austral Trade | 26 | 2024–2026 |
| DAW MANAGEMENT - BROKER DE ASIGURARI | 21 | 2024 |
| SIDE GRUP S.R.L. | 20 | 2024–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.