Friedrich & ClementBETA

Participation Request: Improvement of Highway 8 Kokolan City Centre; KU

Osallistumispyyntö: Vt 8 parantaminen Kokkolan keskusta; KU

Finland · Tampere · how to bid here →

Your path to submission

  1. Deadline: 16 October at 10:00 — 12 days left.
  2. The submission point is stated in the notice (link on the right).
  3. Offer and evidence in: FIN.
  4. Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every month (384 awards, most recently October 2026) — the next award is due around November 2026 by that rhythm. The last award went to Sundström Infra Ab Oy.n = 384
  • 73% of this buyer's awards went to companies that had already won here before (1,942 awards since 2018, spread over 364 companies). That is well above the sector norm (48%) — newcomers have a harder time here than elsewhere.n = 1,942 awards since 2018
  • 20% of the bids received came from small and medium-sized enterprises (9 procedures with a bid mix). Sector: 75%.n = 9
  • The award came in at a median 83% of the estimated value (48 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 91%.n = 48
  • The median procedure drew 4 bids (1,319 procedures with a bid count); 13% ended with a single bidder. Sector: median 4 bids.n = 1,319

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.

Foreign bidders

In Finland · Construction work, 5 contracts went to foreign companies over the last 3 years (of 4,787 recorded awards).

Typical field: median 4 (from 252 awards).

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

What the buyer is looking for

The contract is a total price-based contract (KU). The contract includes the construction of "Vt 8 improvement centre of Kokkola, construction plan" to the extent specified in the plan documents and tender documents with all road arrangements, equipment and equipment to the extent specified in the documents annexed to the tender. In the case of works, the contract includes the execution of the construction work in accordance with the requirements of the contract documents, so that its technical functionality also meets the requirements laid down in the contract documents. Content of the contract: The contract includes construction to the extent specified in the construction plan with all road arrangements, equipment and equipment: - Upgrading of highway 8 Kokkola city centre, Roads, streets, pedestrian and cycling paths according to the construction plan - Construction/repair of bridges:…

Show full description

… V-1831 Torpantie underpass, V-1832 Trolleyman underpass, V-1465 Kirkkolehto underpass (City of Kokkola), S1 Kirkkoti underpass V-1833, V-1585 Printing underpass (optional), S2 Sunt underpass, V-1588 Sunt underpass, S3 Sunt Bridge, V-1587 Sunt Bridge, S4 Mottinen underpass V-73, S5 Kaustari underpass V-1609 - Construction of traffic lights: Termination 23, Termination 83, Termination 84, Termination 85, LIVA-reservation K5 and fibre wiring The contract includes the development phase of geotechnical solutions during work, where the client and the contractor work together to improve the solutions technically and economically. The contract also includes information, reporting and servicing and reporting work during the warranty period, as well as coordination obligations in the role of principal contractor in accordance with the tender specifications. The contract shall include works to the extent specified in the documents accompanying the invitation to tender, including all road arrangements, equipment and installations. The contractor must carry out all the works and related purchases required to complete the work specified in the documents and for which it is not expressly stated in the documents that they are not part of the contractor's performance obligation. The content of the contract is specified in more detail in the tender documents.

Machine translation (EU eTranslation) — official wording via the PDF link.

Selection criteria — in the procurement documents

The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in Finnish.

Contract

BuyerVäylävirasto
TypeWorks
Estimated valuevalue not published
Published16 September 2026
CategoryConstruction work · CPV 45200000

Who has won here before

CompanyAwardsPeriod
Welado Oy · OULU722019–2026
Proxion Plan Oy (FI22615698)//NRC Group Finland Oy722018–2026
GRK Rail Oy612020–2026
Ramboll CM Oy · ESBO542019–2026
Kreate Oy542019–2026
From 18.0M documented awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this

2020125
2021155
2022127
2023130
2024198
2025164
2026127

Who knows the rhythm prepares instead of reacting.

·
days until the deadline — Friday 16 October at 10:00

How to bid

Read the full notice — Original + documents
Goes directly to this tender on TED — Tenders Electronic Daily. The full specification and all annexes are there.

Tender documents — direct download

Specifications and annexes hosted by the buyer — usually accessible without registration.
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now →