Collection and processing of Construction and Demolition Waste (CDW) and Bulky Household Waste (BHW)
Inzamelen en verwerken van Bouw- en Sloopafval (BSA) en Grof Huishoudelijk Afval (GHA)
Netherlands · HAELEN · how to bid here →
Your path to submission
- Deadline: 6 October at 00:00 — 19 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: NLD, NLD.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- 0% of this buyer's awards went to companies that had already won here before (14 awards since 2018, spread over 7 companies). That is well below the sector norm (12%) — this buyer switches suppliers more often than others.n = 14 awards since 2018
- The median procedure drew 2 bids (14 procedures with a bid count); 29% ended with a single bidder. Sector: median 3 bids.n = 14
- Not one of the 14 awards with a known winner country has gone to a foreign company so far. Sector average: 2%.n = 14
- 29% of the bids received came from small and medium-sized enterprises (7 procedures with a bid mix). Sector: 35%.n = 7
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 13/09/2026.
Foreign bidders
In Netherlands · Cleaning, environment & waste, 38 contracts went to foreign companies over the last 3 years (of 2,147 recorded awards) — mostly from Germany, France, Belgium.
Typical field: median 3 (from 1,824 awards).
What the buyer is looking for
The summary in English is being prepared. The official description below is in the original language (DE).
Show original description (DE)
De opdracht betreft het contracteren van een marktpartij(en) voor het inzamelen en verwerken van de afvalstromen bouw- en sloopafval (BSA) en grof huishoudelijk afval (GHA) en ten behoeve van de organisaties RD Maasland en gemeente Horst aan de Maas. De geraamde hoeveelheid afval bedraagt: - BSA: 1.050 ton/jaar - GHA: 1.900 ton/jaar
Selection criteria — via the ESPD
The buyer states in the notice that eligibility is proven through the European Single Procurement Document (ESPD); the concrete requirements are in the tender documents. The document analysis below extracts them from there — bid and evidence in NLD, NLD.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| MCB Milieutechniek B.V. | 1 | 2025 |
| Mic-O-Data B.V. | 1 | 2025 |
| Olympia Nederland B.V. | 1 | 2024 |
| SULO Nederland BV | 1 | 2025 |
| TTC Nederland B.V. | 1 | 2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.