Completion of the building complex of the Home and Activity Centre Hodkovice nad Mohelkou
Dostavba areálu Domova a Centra aktivity Hodkovice nad Mohelkou
Czechia · Liberec · how to bid here →
Your path to submission
- Deadline: 21 September at 00:00 — 6 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: CES.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- 31% of this buyer's awards went to companies that had already won here before (1,211 awards since 2015, spread over 158 companies). That is well below the sector norm (77%) — this buyer switches suppliers more often than others.n = 1,211 awards since 2015
- In this sector the buyer awards roughly every 2 months (36 awards, most recently July 2026) — by that rhythm the next award was due around August 2026. The last award went to SaM silnice a mosty a.s..n = 36
- The median procedure drew 3 bids (979 procedures with a bid count); 17% ended with a single bidder. Sector: median 5 bids.n = 979
- The award came in at a median 60% of the estimated value (187 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 82%.n = 187
- 11% of awards went to companies from abroad (1,211 awards with a known winner country). Sector average: 8%.n = 1,211
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 13/09/2026.
Foreign bidders
In Czechia · Construction work, 136 contracts went to foreign companies over the last 3 years (of 16,086 recorded awards) — mostly from Germany, Poland, France.
Typical field: median 5 (from 34 awards).
What the buyer is looking for
The summary in English is being prepared. The official description below is in the original language (DE).
Show original description (DE)
Předmětem plnění veřejné zakázky je realizace stavby „Dostavba areálu – Domov a Centrum aktivity Hodkovice nad Mohelkou“ spočívající zejména ve výstavbě čtyř obytných objektů komunitního bydlení pro osoby s omezenou schopností pohybu a orientace, jednoho společenského objektu, hospodářského objektu a souvisejících doplňkových staveb a technické infrastruktury.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in CES.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| S.A.W. CONSULTING s.r.o. | 40 | 2022–2026 |
| Ing. Štěpán Illich | 39 | 2022–2026 |
| Tomáš Bulva, DiS. | 34 | 2024–2026 |
| INVESTING CZ spol. s r.o. | 34 | 2022–2026 |
| SiGeKo s.r.o. | 25 | 2025–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.