Sport and Congress Centre Seefeld Tirol GmbH
Sport- und Kongresszentrum Seefeld Tirol GmbH
Austria · Seefeld in Tirol · how to bid here →
Your path to submission
- Deadline: 15 October at 23:00 — 13 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: DEU.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Foreign bidders
In Austria · Architecture & engineering, 409 contracts went to foreign companies over the last 3 years (of 2,797 recorded awards) — mostly from Germany, Italy, Poland.
Typical field: median 4 (from 1,393 awards).
What the buyer is looking for
Sport- und Kongresszentrum Seefeld Tirol GmbH intends to propose energy-saving measures tailored to the property as well as energy-generation measures for all media (electricity, heating, cooling ...) within the framework of energy-saving contracting. The efficiency measures in the areas of building technology, plant technology, user motivation, CO2 reduction are collected as part of an ideas competition. In any case, the implementation of complete savings measures including all necessary trades and ancillary work is desired.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in German.