Friedrich & ClementBETA

Successive supply of materials, equipment and tools for maintenance needs

Sukcesivna dobava materiala, opreme in orodja za potrebe vzdrževanja

Slovenia · Nova Gorica · how to bid here

Your path to submission

  1. Deadline: 16 October at 00:00 — 31 days left.
  2. The submission point is stated in the notice (link on the right).
  3. Offer and evidence in: SLV, SLV, SLV, SLV, SLV, SLV, SLV, SLV, SLV.
  4. Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

Clement What the numbers say about this buyer

  • 8% of this buyer's awards went to companies that had already won here before (13 awards since 2018, spread over 6 companies). That is well below the sector norm (64%) — this buyer switches suppliers more often than others.n = 13 awards since 2018
  • 32% of the bids received came from small and medium-sized enterprises (7 procedures with a bid mix). Sector: 97%.n = 7
  • 16% of the bids received came from other countries (7 procedures with a bid mix) — all bidders, not just the winners. Sector: 1%.n = 7
  • 15% of awards went to companies from abroad (13 awards with a known winner country). Sector average: 4%.n = 13
  • The median procedure drew 2 bids (12 procedures with a bid count); 33% ended with a single bidder. Sector: median 2 bids.n = 12

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 13/09/2026.

Clement
When comparable contracts were last awarded here, usually only 2 offers came in — a solid bid has real chances.
References and certificates from your home country count fully across the EU — that is what European procurement law is for.

Foreign bidders

In Slovenia · Electrical machinery, 13 contracts went to foreign companies over the last 3 years (of 451 recorded awards).

Typical field: median 2 (from 451 awards).

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

What the buyer is looking for

The summary in English is being prepared. The official description below is in the original language (DE).

Show original description (DE)

Kot v DJN.

Description as published (DE).

Selection criteria — in the procurement documents

The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in SLV, SLV, SLV, SLV, SLV, SLV, SLV, SLV, SLV.

Contract

BuyerSOŠKE ELEKTRARNE NOVA GORICA d.o.o.
TypeSupplies
Estimated valuevalue not published
Published15 September 2026
CategoryElectrical machinery · CPV 31000000

Who has won here before

CompanyAwardsPeriod
Hitachi Mitsubishi Hydro Corporation22025–2026
GENERALI zavarovalnica d.d.12025
RIKO, celovite tehnološke rešitve, d.o.o.12026
KOLEKTOR KOLING Inženiring, instalacije, proizvodnja d.o.o.12024
MIKOMI, projekti, izdelava kovinskih konstrukcij, d.o.o.12024
From 13.7M documented awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this

20252
20264

Who knows the rhythm prepares instead of reacting.

·
days until the deadlineFriday 16 October at 00:00

How to bid

Read the full noticeOriginal + documents
Goes directly to this tender on TED — Tenders Electronic Daily. The full specification and all annexes are there.
Tenders like this, every morning at 7:30 in your inbox.
Register now →