Technical provision of summer and winter maintenance – Cistern superstructure
Technické zabezpečenie letnej a zimnej údržby – Cisternová nadstavba
Slovakia · Bratislava - mestská časť Ružinov · how to bid here →
Your path to submission
- Deadline: 19 October at 00:00 — 33 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: SLK, CES.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- 46% of this buyer's awards went to companies that had already won here before (14 awards since 2024, spread over 8 companies). 54% went to new names.n = 14 awards since 2024
- 29% of awards went to companies from abroad (14 awards with a known winner country). Sector average: 16%.n = 14
- The award came in at a median 98% of the estimated value (6 awards with both estimate and value) — pricing at the estimate is usually about right here. Sector: 89%.n = 6
- 0% of the bids received came from other countries (14 procedures with a bid mix) — all bidders, not just the winners. Sector: 9%.n = 14
- The median procedure drew 2 bids (14 procedures with a bid count); 29% ended with a single bidder. Sector: median 2 bids.n = 14
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 13/09/2026.
Foreign bidders
In Slovakia · Transport equipment, 69 contracts went to foreign companies over the last 3 years (of 873 recorded awards) — mostly from Czechia, Germany, Poland.
Typical field: median 3 (from 10 awards).
What the buyer is looking for
The summary in English is being prepared. The official description below is in the original language (DE).
Show original description (DE)
Predmetom zákazky je dodanie cisternovej nadstavby na zabezpečenie letnej a zimnej údržby, v rozsahu a podľa technickej špecifikácie uvedenej v súťažných podkladoch
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in SLK, CES.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| HYCA s.r.o. | 4 | 2024 |
| Alfasol, s. r. o. | 3 | 2024–2025 |
| UNIKONT SLOVAKIA, spol. s r.o. | 2 | 2024 |
| EUROMAR spol. s r.o. | 1 | 2024 |
| Balatech s. r. o. | 1 | 2024 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.