Friedrich & ClementBETA

Contract for the Reinforcement of Water Supply to the Algarve – Water Intake Solution at Pomarão – Phase A (Intake, Pumping Station, Rising Main, Regulation Reservoir, sections 1, 2 and 9 of the Gravity Main and Discharge Works).

Empreitada do Reforço do Abastecimento de Água ao Algarve – Solução da Tomada de Água no Pomarão – Fase A (Captação, Estação elevatória Conduta elevatória, Reservatório de regularização, troço 1, 2 e 9 da Conduta gravítica e Obra de restituição).

Portugal · FARO · how to bid here

Your path to submission

  1. Deadline: 8 October at 00:00 — 23 days left.
  2. The submission point is stated in the notice (link on the right).
  3. Offer and evidence in: POR.
  4. Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

Clement What the numbers say about this buyer

  • 16% of this buyer's awards went to companies that had already won here before (124 awards since 2014, spread over 83 companies). That is well below the sector norm (38%) — this buyer switches suppliers more often than others.n = 124 awards since 2014
  • The median procedure drew just one bid (5 procedures with a bid count); 60% ended with a single bidder. Sector: median 4 bids.n = 5
  • Not one of the 124 awards with a known winner country has gone to a foreign company so far. Sector average: 2%.n = 124

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 15/09/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.

Foreign bidders

In Portugal · Construction work, 16 contracts went to foreign companies over the last 3 years (of 1,015 recorded awards).

Typical field: median 4 (from 974 awards).

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

What the buyer is looking for

The summary in English is being prepared. The official description below is in the original language (DE).

Show original description (DE)

Empreitada do Reforço do Abastecimento de Água ao Algarve – Solução da Tomada de Água no Pomarão – Fase A (Captação, Estação elevatória Conduta elevatória, Reservatório de regularização, troço 1, 2 e 9 da Conduta gravítica e Obra de restituição).

Description as published (DE).

Selection criteria — in the procurement documents

The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in POR.

Eligibility analysis from the tender documents

Contract

BuyerÁguas do Algarve, SA
TypeWorks
Estimated value122.230.000 €
Published15 September 2026
CategoryConstruction work · CPV 45232150

Who has won here before

CompanyAwardsPeriod
Hach Lange, Lda.42026
AQUASIS - Sistemas de Informação, S.A.32016–2026
ZEMBE - Distribuição e Soluções de Material Elétrico, Lda.32025–2026
Águas de Santo André, SA22026
SYST-MP, Lda.22026
From 13.7M documented awards · regular winners know this buyer's requirements — that is your competition.
·
days until the deadlineThursday 8 October at 00:00

How to bid

Read the full noticeOriginal + documents
Goes directly to this tender on TED — Tenders Electronic Daily. The full specification and all annexes are there.

Tender documents — direct download

Specifications and annexes hosted by the buyer — usually accessible without registration.
Tenders like this, every morning at 7:30 in your inbox.
Register now →