Contract for the Reinforcement of Water Supply to the Algarve – Water Intake Solution at Pomarão – Phase A (Intake, Pumping Station, Rising Main, Regulation Reservoir, sections 1, 2 and 9 of the Gravity Main and Discharge Works).
Empreitada do Reforço do Abastecimento de Água ao Algarve Solução da Tomada de Água no Pomarão Fase A (Captação, Estação elevatória Conduta elevatória, Reservatório de regularização, troço 1, 2 e 9 da Conduta gravítica e Obra de restituição).
Portugal · FARO · how to bid here →
Your path to submission
- Deadline: 8 October at 00:00 — 23 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: POR.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- 16% of this buyer's awards went to companies that had already won here before (124 awards since 2014, spread over 83 companies). That is well below the sector norm (38%) — this buyer switches suppliers more often than others.n = 124 awards since 2014
- The median procedure drew just one bid (5 procedures with a bid count); 60% ended with a single bidder. Sector: median 4 bids.n = 5
- Not one of the 124 awards with a known winner country has gone to a foreign company so far. Sector average: 2%.n = 124
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 15/09/2026.
Foreign bidders
In Portugal · Construction work, 16 contracts went to foreign companies over the last 3 years (of 1,015 recorded awards).
Typical field: median 4 (from 974 awards).
What the buyer is looking for
The summary in English is being prepared. The official description below is in the original language (DE).
Show original description (DE)
Empreitada do Reforço do Abastecimento de Água ao Algarve Solução da Tomada de Água no Pomarão Fase A (Captação, Estação elevatória Conduta elevatória, Reservatório de regularização, troço 1, 2 e 9 da Conduta gravítica e Obra de restituição).
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in POR.
Eligibility analysis from the tender documents
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Hach Lange, Lda. | 4 | 2026 |
| AQUASIS - Sistemas de Informação, S.A. | 3 | 2016–2026 |
| ZEMBE - Distribuição e Soluções de Material Elétrico, Lda. | 3 | 2025–2026 |
| Águas de Santo André, SA | 2 | 2026 |
| SYST-MP, Lda. | 2 | 2026 |