Ballyragget Weir Barrier Mitigation Project
Ireland · Dublin · how to bid here →
Your path to submission
- Deadline: 2 October at 00:00 — 17 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: ENG.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- The median procedure drew 3 bids (287 procedures with a bid count); 38% ended with a single bidder. Sector: median 7 bids.n = 287
- 31% of this buyer's awards went to companies that had already won here before (298 awards since 2014, spread over 193 companies). 69% went to new names.n = 298 awards since 2014
- 8% of awards went to companies from abroad (298 awards with a known winner country). Sector average: 9%.n = 298
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 13/09/2026.
Foreign bidders
In Ireland · Business services, 323 contracts went to foreign companies over the last 3 years (of 4,374 recorded awards) — mostly from United Kingdom, France, Germany.
Typical field: median 7 (from 3,554 awards).
What the buyer is looking for
The summary in English is being prepared. The official description below is in the original language (DE).
Show original description (DE)
Provision of engineering consultancy services for Feasibility Study, Preliminary Design and Statuary Process for Ballyragget Weir Barrier Mitigation Project
Selection criteria — via the ESPD
The buyer states in the notice that eligibility is proven through the European Single Procurement Document (ESPD); the concrete requirements are in the tender documents. The document analysis below extracts them from there — bid and evidence in ENG.
Eligibility analysis from the tender documents
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Electro Fishing Services Ltd | 7 | 2015–2025 |
| Downeaster ltd | 6 | 2014–2025 |
| Storm-tec | 5 | 2015–2024 |
| Cunningham Covers | 5 | 2018–2022 |
| LE GOUESSANT AQUACULTURE | 5 | 2017–2024 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.