Friedrich & ClementBETA

PEACEPLUS The Nest Building Works

Ireland · Sligo · how to bid here

Your path to submission

  1. Deadline: 16 October at 00:00 — 31 days left.
  2. The submission point is stated in the notice (link on the right).
  3. Offer and evidence in: ENG.
  4. Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every 2 months (78 awards, most recently August 2026) — the next award is due around October 2026 by that rhythm. The last award went to Stephen Walsh Construction.n = 78
  • 37% of this buyer's awards went to companies that had already won here before (461 awards since 2013, spread over 246 companies). That is well below the sector norm (52%) — this buyer switches suppliers more often than others.n = 461 awards since 2013
  • The median procedure drew 3 bids (419 procedures with a bid count); 27% ended with a single bidder. Sector: median 5 bids.n = 419
  • The award came in at a median 100% of the estimated value (23 awards with both estimate and value) — pricing at the estimate is usually about right here. Sector: 98%.n = 23
  • 4% of awards went to companies from abroad (461 awards with a known winner country). Sector average: 2%.n = 461

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 13/09/2026.

Foreign bidders

In Ireland · Construction work, 113 contracts went to foreign companies over the last 3 years (of 4,990 recorded awards) — mostly from United Kingdom, Greece, Germany.

Typical field: median 3 (from 62 awards).

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

What the buyer is looking for

The summary in English is being prepared. The official description below is in the original language (DE).

Show original description (DE)

Demolition of 2no. existing storage buildings, Construction of transformative works at The Nest, Quay Street, Sligo, F91 K79P.

Description as published (DE).

Selection criteria — in the procurement documents

The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in ENG.

Contract

BuyerSligo County Council
TypeWorks
Estimated value400.000 €
Published15 September 2026
CategoryConstruction work · CPV 45000000

Who has won here before

CompanyAwardsPeriod
harrington concrete and quarries222015–2025
Gerald Love Contracts152014–2025
Breedon Surfacing Solutions Ireland Ltd t/a Breedon Ireland92015–2025
KILCAWLEY CONSTRUCTION82017–2024
TRIUR Construction Limited72016–2025
From 13.7M documented awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this

20193
20201
20211
20237
202435
202543
202625

Who knows the rhythm prepares instead of reacting.

·
days until the deadlineFriday 16 October at 00:00

How to bid

Read the full noticeOriginal + documents
Goes directly to this tender on TED — Tenders Electronic Daily. The full specification and all annexes are there.
Tenders like this, every morning at 7:30 in your inbox.
Register now →