Framework Agreement Engineering Services 2027 - 2030
Raamovereenkomst Ingenieursdiensten 2027 - 2030
Netherlands · Hilversum · how to bid here →
Your path to submission
- Deadline: 28 October at 00:00 — 43 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: NLD.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (6 awards, most recently September 2026) — the next award is due around November 2026 by that rhythm. The last award went to Benthem Crouwel Architekten B.V..n = 6
- The median procedure drew 2 bids (102 procedures with a bid count); 33% ended with a single bidder. Sector: median 5 bids.n = 102
- 2% of this buyer's awards went to companies that had already won here before (110 awards since 2015, spread over 51 companies). 98% went to new names.n = 110 awards since 2015
- The award came in at a median 87% of the estimated value (7 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 90%.n = 7
- 11% of awards went to companies from abroad (110 awards with a known winner country). Sector average: 8%.n = 110
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 13/09/2026.
Foreign bidders
In Netherlands · Architecture & engineering, 127 contracts went to foreign companies over the last 3 years (of 2,639 recorded awards) — mostly from Germany, France, United Kingdom.
Typical field: median 3 (from 6 awards).
What the buyer is looking for
The summary in English is being prepared. The official description below is in the original language (DE).
Show original description (DE)
Raamovereenkomst Ingenieursdiensten 2027 - 2030 nb
Selection criteria — via the ESPD
The buyer states in the notice that eligibility is proven through the European Single Procurement Document (ESPD); the concrete requirements are in the tender documents. The document analysis below extracts them from there — bid and evidence in NLD.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Mourik Infra B.V. | 2 | 2024 |
| PQR B.V. | 2 | 2024–2025 |
| Jos Scholman Groen B.V. | 1 | 2024 |
| KP Adviseurs BV | 1 | 2024 |
| LeasePlan Nederland NV | 1 | 2015 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.