Water restoration Ahr BNA230 Walporzheim: BA04 Transport and utilization of excavated soil
Gewässerwiederherstellung Ahr BNA230 Walporzheim: BA04 Abtransport und Verwertung von Bodenaushub
Germany · Bad Neuenahr-Ahrweiler · how to bid here →
Your path to submission
- Deadline: 28 September at 00:00 — 12 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: DEU.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every month (12 awards, most recently November 2025) — by that rhythm the next award was due around December 2025. The last award went to Wahl GmbH.n = 12
- 73% of this buyer's awards went to companies that had already won here before (12 awards since 2025, spread over 4 companies). That is well above the sector norm (40%) — newcomers have a harder time here than elsewhere.n = 12 awards since 2025
- The median procedure drew 6 bids (11 procedures with a bid count); 18% ended with a single bidder. Sector: median 4 bids.n = 11
- Across 7 procedures with structured selection criteria, this buyer most often required: References: works (7 of 7), Share of subcontractors (7 of 7), Minimum turnover in the contract field (7 of 7), Trade register enrolment (7 of 7).n = 7
- Not one of the 12 awards with a known winner country has gone to a foreign company so far. Sector average: 0%.n = 12
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 13/09/2026.
Foreign bidders
In Germany · Construction work, 660 contracts went to foreign companies over the last 3 years (of 240,202 recorded awards) — mostly from Austria, France, Poland.
Typical field: median 6 (from 11 awards).
What the buyer is looking for
The summary in English is being prepared. The official description below is in the original language (DE).
Show original description (DE)
Der Kreis Ahrweiler beabsichtigt, das Gewässerbett der Ahr im Stadtgebiet Bad Neuenahr - Ahrweiler im Zuge einer Gewässerwiederherstellung partiell aufzuweiten sowie ökologisch aufzuwerten. Im Zuge dessen soll in dem Teilbauabschnitt BNA230 der Hauptaushub zur Aufweitung des Gewässerabflussprofils durchgeführt werden. Leistungsbestandteil der Ausschreibung sind die nachfolgenden Inhalte: - Beprobung und Analytik der auf dem zentralen Bodenlager verorteten Haufwerke - Aufnahme und Abtransport der Haufwerke zu einer Verwertungsstelle - Dokumentation der Verwertung / Entsorgung
What you must prove — eligibility criteria
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Wahl GmbH · Vaihingen an der Enz | 5 | 2025 |
| Geschwister Balter Bauunternehmung GmbH · Hellenthal-Losheim | 4 | 2025 |
| Knoll GmbH & Co. KG | 2 | 2025 |
| Knoll GmbH · Ulm | 1 | 2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.