Production Printer Output Center
Produktionsdrucker Outputcenter
Germany · Hannover · how to bid here →
Your path to submission
- Deadline: 28 September at 00:00 — 12 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: DEU.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (50 awards, most recently May 2026) — by that rhythm the next award was due around July 2026. The last award went to Fsas GmbH.n = 50
- 60% of this buyer's awards went to companies that had already won here before (143 awards since 2022, spread over 58 companies). That is well above the sector norm (40%) — newcomers have a harder time here than elsewhere.n = 143 awards since 2022
- 33% of the bids received came from small and medium-sized enterprises (20 procedures with a bid mix). Sector: 54%.n = 20
- The median procedure drew 2 bids (128 procedures with a bid count); 48% ended with a single bidder. Sector: median 2 bids.n = 128
- Across 24 procedures with structured selection criteria, this buyer most often required: Trade register enrolment (20 of 24), Independent quality certificate (e.g. ISO 9001) (8 of 24), References: works (7 of 24), References: services (6 of 24).n = 24
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 13/09/2026.
Foreign bidders
In Germany · Office & computing machinery, 100 contracts went to foreign companies over the last 3 years (of 13,104 recorded awards) — mostly from Austria, France, Estonia.
Typical field: median 4 (from 50 awards).
What the buyer is looking for
The summary in English is being prepared. The official description below is in the original language (DE).
Show original description (DE)
Kauf von Produktionsdruckern im Click-Preis-Modell für das Outputcenter des Landesbetriebs IT.Niedersachsen
What you must prove — eligibility criteria
Zertifizierung (Mit dem Angebot; Mittels Dritterklärung): Ihr Unternehmen besitzt eine gültige Zertifizierung ISO 27001 - Information Security System oder gleichwertig. Dieses Zertifikat darf nicht älter als drei Jahre sein und muss bis zum Tag der Abgabe des … ▸▾
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Computacenter · Ratingen | 15 | 2023–2026 |
| ARKTIS GmbH · Berlin | 6 | 2023–2026 |
| ACP IT Solutions GmbH · München | 5 | 2025–2026 |
| Bell Computer-Netzwerke GmbH · Bonn | 5 | 2025–2026 |
| NTT Germany AG & Co KG | 5 | 2024–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on cosinex Vergabemarktplatz / DTVP → Registration, signature, fees — from the operator's bidder manual.