Framework Agreement for Grounding Transformers with E-Coil
Rahmenvereinbarung Erdungstransformatoren mit E-Spule
Austria · Linz · how to bid here →
Your path to submission
- Deadline: 5 October at 13:00 — 2 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: DEU, DEU.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 4 months (7 awards, most recently November 2024) — by that rhythm the next award was due around March 2025. The last award went to KONCAR D&ST.n = 7
- 12% of this buyer's awards went to companies that had already won here before (18 awards since 2015, spread over 6 companies). That is well below the sector norm (27%) — this buyer switches suppliers more often than others.n = 18 awards since 2015
- The median procedure drew 3 bids (9 procedures with a bid count); 22% ended with a single bidder. Sector: median 2 bids.n = 9
- 44% of awards went to companies from abroad (18 awards with a known winner country). Sector average: 36%.n = 18
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.
Foreign bidders
In Austria · Electrical machinery, 126 contracts went to foreign companies over the last 3 years (of 490 recorded awards) — mostly from Germany, France, Italy.
Typical field: median 2 (from 289 awards).
What the buyer is looking for
The contracting authority intends to conclude a framework agreement with two companies - the best bidder and the second-ranked bidder - for the fulfilment of the scope of services. The duration of the framework agreement is four years (01/01/2027 to 31/12/2028) and includes the option to extend the service period by one year each (maximum 6 years in total).
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in German.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Koncar D&ST · Zagreb | 3 | 2022–2024 |
| ELIN GmbH & Co KG | 1 | 2015 |
| S.E.A Societa Elettromeccanica Arzignanese S.p.A | 1 | 2024 |
| ETD Transformatory a.s. | 1 | 2024 |
| Hitachi Energy Austria AG | 1 | 2024 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.