Framework Agreement Flight Deck Crew Suit
Sweden · Stockholm · how to bid here →
Your path to submission
- Deadline: 14 October at 23:59 — 11 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: ENG.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (5 awards, most recently September 2026) — the next award is due around November 2026 by that rhythm. The last award went to DRS Network & Imaging Systems, LLC.n = 5
- 4% of this buyer's awards went to companies that had already won here before (77 awards since 2021, spread over 19 companies). 96% went to new names.n = 77 awards since 2021
- The median procedure drew 2 bids (69 procedures with a bid count); 28% ended with a single bidder.n = 69
- 40% of awards went to companies from abroad (77 awards with a known winner country).n = 77
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.
Foreign bidders
In Sweden, 427 contracts went to foreign companies over the last 3 years (of 5,659 recorded awards) — mostly from Finland, Germany, Denmark.
Typical field: median 1 (from 5 awards).
What the buyer is looking for
FMV has on behalf of SwAF received an inquiry to procure a framework agreement for Flight Deck Crew Suit. Flight Deck Crew Suit works as a protective clothing during various rescuing operations carried out by military personnel on sea. Given that the suit will be used in demanding environment, it has to meet certain requirements such as fire resistance and water resistance. The framework agreement will be valid for a total of 12 years with the following arrangement: three (3) initial years, with an extension option of two (2) + two (2) + five (5) years. The last option of five (5) years is only applicable for the spare parts.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in English.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| OMP ENGINEERING | 4 | 2021–2022 |
| Sener Aerospace and Defence (SCR Division) | 1 | 2026 |
| Basalt AB | 1 | 2026 |
| Hydmos Industriteknik Aktiebolag | 1 | 2026 |
| Hüllert Maskin AB | 1 | 2026 |