Delivery of two electric buses
Dostawa dwóch autobusów elektrycznych
Poland · Czarny Bór · how to bid here →
Your path to submission
- Deadline: 18 September at 00:00 — 3 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: POL.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- 32% of this buyer's awards went to companies that had already won here before (57 awards since 2021, spread over 38 companies). 68% went to new names.n = 57 awards since 2021
- Not one of the 57 awards with a known winner country has gone to a foreign company so far. Sector average: 2%.n = 57
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 13/09/2026.
Foreign bidders
In Poland · Transport equipment, 191 contracts went to foreign companies over the last 3 years (of 24,142 recorded awards) — mostly from Germany, Finland, Italy.
Typical field: median 2 (from 5,467 awards).
What the buyer is looking for
1. The subject of the contract is ‘Supply of two electric buses’. 2. This contract is co-financed by the European Regional Development Fund under the European Funds for Lower Silesia 2021-2027 programme, Priority European Funds for Urban Mobility of Lower Silesia, title of the project ‘Construction of infrastructure for clean urban transport’. 3. A detailed description of the subject-matter of the contract is set out in Annex 1 to the FTZ – Detailed description of the subject-matter of the contract. 4. The contracting authority indicates that the subject of the contract will be put to use by the operator selected in a separate procedure. Therefore, the Contractor may not exclude from the warranty and warranty liability for detected defects, defects, failures occurring during the use of the subject of the contract by this operator. 5. More information in SWZ.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in POL.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| BUDOSPRZĘT-WAŁBRZYCH Sp. z o.o. | 6 | 2021–2026 |
| Świdnickie Przedsiębiorstwo Budowy Dróg i Mostów Sp. z o.o. | 5 | 2022–2026 |
| Usługi Remontowo- Budowlane Mateusz Kapuła | 4 | 2022–2026 |
| Bank Spółdzielczy w Kamiennej Górze | 3 | 2024–2025 |
| SERAFIŃSKI Roboty Ziemne i Budowlane Tomasz Serafiński | 2 | 2023 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.