Supply of block and tap transformers for the OCGT Jaworzno peak unit at the location of TAURON Wytwarzanie S.A. - Jaworzno III Power Plant Branch
Dostawa transformatorów blokowych i odczepowych dla jednostki szczytowej gazowej OCGT Jaworzno w lokalizacji TAURON Wytwarzanie S.A. - Oddział Elektrownia Jaworzno III
Poland · Jaworzno · how to bid here →
Your path to submission
- Deadline: 14 October at 00:00 — 29 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: POL.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- 15% of this buyer's awards went to companies that had already won here before (150 awards since 2018, spread over 68 companies). That is well below the sector norm (27%) — this buyer switches suppliers more often than others.n = 150 awards since 2018
- 38% of the bids received came from small and medium-sized enterprises (53 procedures with a bid mix). Sector: 72%.n = 53
- The median procedure drew 2 bids (135 procedures with a bid count); 41% ended with a single bidder. Sector: median 3 bids.n = 135
- 8% of awards went to companies from abroad (150 awards with a known winner country). Sector average: 2%.n = 150
- The award came in at a median 88% of the estimated value (42 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 88%.n = 42
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 13/09/2026.
Foreign bidders
In Poland · Electrical machinery, 87 contracts went to foreign companies over the last 3 years (of 8,100 recorded awards) — mostly from Germany, France, Spain.
Typical field: median 3 (from 1,391 awards).
What the buyer is looking for
Przedmiotem zamówienia jest Dostawa transformatorów blokowych i odczepowych dla jednostki szczytowej gazowej OCGT Jaworzno w lokalizacji TAURON Wytwarzanie S.A. - Oddział Elektrownia Jaworzno III. Szczegółowy opis Przedmiotu Zamówienia został określony we Wzorze Umowy stanowiącym Załącznik nr 3 do Specyfikacji Warunków Zamówienia (SWZ).
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in POL.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| ECOL Sp. z o.o. | 5 | 2024–2026 |
| GRUPA AZOTY ZAKŁADY AZOTOWE KĘDZIERZYN S.A. | 4 | 2024–2026 |
| Kopalnia Wapienia "Czatkowice" Sp. z o.o. | 3 | 2024–2026 |
| MTE TECHNOLOGIA Sp. z o.o. | 3 | 2025–2026 |
| CTL Logistics Sp. z o.o. | 2 | 2024–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.