Framework agreement with purchase orders and subsequent supporting contracts for event organization, tent rental, equipment and furniture necessary for events organized by the North Department - 4 lots
Accord-cadre à bons de commande et à marchés subséquents d'accompagnement sur les manifestations événementielles, de location de chapiteaux, de matériels et de mobiliers nécessaires à la réalisation des événements organisés par le Département du Nord - 4 lots
France · Lille · how to bid here →
Your path to submission
- Deadline: 15 October at 00:00 — 30 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: FRA, FRA, FRA, FRA.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 6 months (9 awards, most recently May 2026) — the next award is due around November 2026 by that rhythm. The last award went to LEGALLAIS BOUCHARD.n = 9
- 83% of the bids received came from small and medium-sized enterprises (6 procedures with a bid mix). Sector: 44%.n = 6
- 28% of this buyer's awards went to companies that had already won here before (1,959 awards since 2015, spread over 1,014 companies). 72% went to new names.n = 1,959 awards since 2015
- The award came in at a median 36% of the estimated value (88 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 55%.n = 88
- The median procedure drew 5 bids (1,015 procedures with a bid count); 12% ended with a single bidder. Sector: median 4 bids.n = 1,015
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 13/09/2026.
Foreign bidders
In France · Construction materials, 182 contracts went to foreign companies over the last 3 years (of 3,637 recorded awards) — mostly from Germany, Spain, Romania.
Typical field: median 5 (from 9 awards).
What the buyer is looking for
Le besoin est décrit au CCTP. Il s'agit d'un accord-cadre mono-attributaire, conclu avec un (1) seul opérateur économique par lot. Il sera exécuté en partie par la conclusion de marchés subséquents et en partie par l'émission de bons de commande, lors de la survenance du besoin. Le lot 1 est un accord-cadre de services. Les lots 2, 3 et 4 sont des accords-cadres de fournitures
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in FRA, FRA, FRA, FRA.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| IRTS HAUTS DE FRANCE | 10 | 2022–2026 |
| GODIN MAN | 8 | 2025–2026 |
| EIFFAGE ENERGIE SYSTEMES - NORD | 8 | 2022–2025 |
| ENTREPRISE IERA | 8 | 2023–2025 |
| ALNOR | 7 | 2023–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on PLACE — Plateforme des achats de l'État (Frankreich) → Registration, signature, fees — from the operator's bidder manual.