E-301 Conduits and Working Passages DP 3, Slakthusområdet Project.
E-301 Ledningar och arbetsgator DP 3, projekt Slakthusområdet.
Sweden · Stockholm · how to bid here →
Your path to submission
- Deadline: 11 October at 23:59 — 8 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: SWE.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- The median procedure drew 5 bids (71 procedures with a bid count); 8% ended with a single bidder. Sector: median 7 bids.n = 71
- 0% of this buyer's awards went to companies that had already won here before (75 awards since 2021, spread over 9 companies). 100% went to new names.n = 75 awards since 2021
- 7% of awards went to companies from abroad (75 awards with a known winner country). Sector average: 4%.n = 75
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.
Foreign bidders
In Sweden · Construction work, 4 contracts went to foreign companies over the last 3 years (of 637 recorded awards).
Typical field: median 4 (from 5 awards).
What the buyer is looking for
The summary in English is being prepared. The official description below is in the original language (SV).
Show original description (SV)
Markarbeten för ledningar och arbetsgator inom detaljplan 3 i projekt Slakthusområdet.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in Swedish.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Peab Anläggning AB | 1 | 2026 |
| NCC Sverige AB | 1 | 2026 |
| Skannovo AB | 1 | 2026 |
| Svevia AB (publ) | 1 | 2026 |
| Posti Logistics Solution AB | 1 | 2026 |