Friedrich & ClementBETA

70-00601-2460-E Technical Planning ELT AG 4-5 - PR1276201-2460-B

70-00601-2460-E Fachplanung ELT AG 4-5 - PR1276201-2460-B

Germany · München · how to bid here →

Your path to submission

  1. Deadline: 8 October at 10:30 — 5 days left.
  2. The submission point is stated in the notice (link on the right).
  3. Offer and evidence in: DEU.
  4. Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every month (30 awards, most recently August 2026) — by that rhythm the next award was due around September 2026. The last award went to die3 landschaftsarchitektur Brückmann & Platz LA Part GmbB.n = 30
  • 56% of this buyer's awards went to companies that had already won here before (784 awards since 2022, spread over 337 companies). That is well above the sector norm (44%) — newcomers have a harder time here than elsewhere.n = 784 awards since 2022
  • The median procedure drew 3 bids (783 procedures with a bid count); 37% ended with a single bidder. Sector: median 3 bids.n = 783
  • From notice to award takes a median 88 days here (207 procedures). Sector: 133 days.n = 207
  • Across 65 procedures with structured selection criteria, this buyer most often required: Minimum turnover in the contract field (65 of 65), Minimum number of managers (65 of 65), Share of subcontractors (65 of 65), Professional liability insurance (65 of 65).n = 65

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/10/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.

Foreign bidders

In Germany · Architecture & engineering, 401 contracts went to foreign companies over the last 3 years (of 109,680 recorded awards) — mostly from Austria, Switzerland, Poland.

Typical field: median 3 (from 31 awards).

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

What the buyer is looking for

70-00601-2460-E Fachplanung ELT AG 4-5 · In the course of the renovation of the existing building I of the Fraunhofer Institute for Layer and Surface Technology IST in Braunschweig, which was occupied in 1994, the renovation of the electrotechnical systems is planned. Due to outdated and sometimes failure-prone infrastructure, especially in the areas of high and low current, data network, lighting, safety lighting and the supply of technical systems, the permanent operational and working ability is endangered. The aim is the needs-based renewal and adaptation of the ELT systems, including sub-distributions, UPS, lighting, data network, WLAN and fire protection-relevant systems, in order to ensure safe, energy-efficient and future-proof research operations. Implementation is carried out in several construction phases during ongoing operation; this invitation to tender concerns the 1st…

Show full description

… construction phase. Contract: Implementation of construction planning services of the Fraunhofer IST Braunschweig - Renovation Building I 1.BA, total costs KG 200-700 (without original equipment) max. 10,800,000 net (without value added tax). The implementation of the project is carried out in the ZBau procedure, including the preparation of an application and construction document as well as a concept discussion with the grantors. Fixed price contract! Fee according to HOAI in accordance with the model contracts of RBBau. Gradual commissioning of the service phases 2-4 and 5-8 HOAI in accordance with the model contracts of RBBau. Fee zone (§56 HOAI): 2-3, fee rate (§56 HOAI): Basic fee rate and: Offer of additional services according to price sheet - see procurement documents Amount of ancillary costs: according to the latest version of the RIFT-Bund conversion surcharge: 0.35 The building structure to be processed is remunerated as follows: the building structure to be processed is already taken into account in the form of an increased conversion surcharge and thus compensated for special services: Inventory according to time expenditure approx. 150h. Hourly rates to be offered

Machine translation (EU eTranslation) — official wording via the PDF link.

What you must prove — eligibility criteria

›
References: works
"- Referenzen gem. § 46 Abs. 3 Nr. 1 VgV - Referenzen mit vergleichbarer Bauaufgabe und Komplexität gem. § 75 Abs. 5 VgV - Freie Referenzen gem. § 75 Abs. 5 VgV Die Eigenerklärung und die darin enthaltenen ausführlichen Anforderungen - auch hinsichtlich Nachwe… ▸▾
"- Referenzen gem. § 46 Abs. 3 Nr. 1 VgV - Referenzen mit vergleichbarer Bauaufgabe und Komplexität gem. § 75 Abs. 5 VgV - Freie Referenzen gem. § 75 Abs. 5 VgV Die Eigenerklärung und die darin enthaltenen ausführlichen Anforderungen - auch hinsichtlich Nachweise - sind in den Auftragsunterlagen als Bewerbungsbogen enthalten. Mindeststandards: Siehe Auftragsunterlagen."
›
Staff qualifications
Siehe Referenzen zu bestimmten Arbeiten sowie Eintragung in ein relevantes Berufsregister
›
Minimum annual headcount
"Durchschnittliche jährliche Beschäftigtenzahl gem. § 46 Abs. 3 Nr. 8 VgV Die Eigenerklärung und die darin enthaltenen ausführlichen Anforderungen - auch hinsichtlich Nachweise - sind in den Auftragsunterlagen als Bewerbungsbogen enthalten. Mindeststandards: Siehe Auftragsunterlagen."
›
Minimum number of managers
Siehe Durchschnittliche jährliche Belegschaft
›
Share of subcontractors
"- Unterauftragnehmer § 36 Abs. 1 in Verbindung mit § 47 Abs. 1 VgV - Bewerber- / Bietergemeinschaften § 43 Abs. 2 VgV Die Eigenerklärung und die darin enthaltenen ausführlichen Anforderungen - auch hinsichtlich Nachweise - sind in den Auftragsunterlagen als Bewerbungsbogen enthalten. Mindeststandards: Siehe Auftragsunterlagen."
›
Professional liability insurance
Berufshaftpflichtversicherung gem. § 45 Abs. 1 Nr. 3 VgV Die Eigenerklärung und die darin enthaltenen ausführlichen Anforderungen - auch hinsichtlich Nachweise - sind in den Auftragsunterlagen als Bewerbungsbogen enthalten. Mindeststandards: Siehe Auftragsunterlagen.
›
Other economic requirement
siehe Bewerbungsunterlagen
›
Minimum turnover in the contract field
Mindestjahresumsatz gem. § 45 Abs. 1 Nr. 1 VgV Die Eigenerklärung und die darin enthaltenen ausführlichen Anforderungen - auch hinsichtlich Nachweise - sind in den Auftragsunterlagen als Bewerbungsbogen enthalten. Mindeststandards: Siehe Auftragsunterlagen.
Requirement texts are quoted in the notice's original language — the official wording is binding.

Contract

BuyerFraunhofer-Gesellschaft zur Förderung der angewandten Forschung e.V. - Einkauf B12 - Vergabestelle Bau
TypeServices
Estimated valuevalue not published
Published9 September 2026
CategoryArchitecture & engineering · CPV 71321000

Who has won here before

CompanyAwardsPeriod
BplusL Infra Log GmbH102023–2025
Lindner SE · Arnstorf102024–2025
B&S Automatisierungssysteme Erfurt GmbH · Erfurt72022
Popp & Lausser GmbH62025
Alfred Schlaubke GmbH · Glashütte62025
From 18.0M documented awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this

202514
2026101

Who knows the rhythm prepares instead of reacting.

·
days until the deadline — Thursday 8 October at 10:30

How to bid

Read the full notice — Original + documents
Goes directly to this tender on TED — Tenders Electronic Daily. The full specification and all annexes are there.

Tender documents — direct download

Specifications and annexes hosted by the buyer — usually accessible without registration.
Friedrich finds tenders like this for you — every morning at 7:30, and he learns from your feedback.
Register now →
70-00601-2460-E Technical Planning ELT AG 4-5 - PR1276201-2460-B — Friedrich & Clement