Request to participate Liminka-Oulu double track, Oulunlahti overpass
Osallistumispyyntö Liminka-Oulu kaksoisraide, Oulunlahden ylikulkusilta
Finland · HELSINKI · how to bid here →
Your path to submission
- Deadline: 8 October at 10:00 — 5 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: FIN.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every month (384 awards, most recently October 2026) — the next award is due around November 2026 by that rhythm. The last award went to Sundström Infra Ab Oy.n = 384
- 73% of this buyer's awards went to companies that had already won here before (1,942 awards since 2018, spread over 364 companies). That is well above the sector norm (48%) — newcomers have a harder time here than elsewhere.n = 1,942 awards since 2018
- 20% of the bids received came from small and medium-sized enterprises (9 procedures with a bid mix). Sector: 75%.n = 9
- The award came in at a median 83% of the estimated value (48 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 91%.n = 48
- The median procedure drew 4 bids (1,319 procedures with a bid count); 13% ended with a single bidder. Sector: median 4 bids.n = 1,319
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 03/10/2026.
Foreign bidders
In Finland · Construction work, 5 contracts went to foreign companies over the last 3 years (of 4,787 recorded awards).
Typical field: median 4 (from 252 awards).
What the buyer is looking for
The contract is a total contract (KU) at a total price, which includes a small part of the construction planning (planning of electric railway changes). The contract includes the renewal of the existing Oulunlahti overpass over the Seinäjoki-Oulu section. In addition, the contract includes the improvement of mt 815 Airport Road and mt 847 Limingantie and related streets and jkpp fairways, as well as the construction of drainage structures, the environment, lighting, traffic control and traffic lights. The contract also includes the construction planning and implementation of the necessary changes to the electric railway line at the overpass bridge. A more detailed description of the content of the contract can be found in the tender documents. For the information of the candidates, the client supplements the construction plans during the calculation period of the invitation to tender…
Show full description
… with, for example, the following plans: - In addition to the Finnish Transport Infrastructure Agency, the project was commissioned by Fintraffic Tie Oy and the City of Oulu on the routes under the Oulunlahti overpass.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in Finnish.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Proxion Plan Oy (FI22615698)//NRC Group Finland Oy | 72 | 2018–2026 |
| Welado Oy · OULU | 72 | 2019–2026 |
| GRK Rail Oy | 61 | 2020–2026 |
| Kreate Oy | 54 | 2019–2026 |
| Ramboll CM Oy · ESBO | 54 | 2019–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.