Management and maintenance WKC
Beheer en onderhoud WKC
Netherlands · Delft · how to bid here →
Your path to submission
- Deadline: 7 October at 10:00 — 3 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: NLD.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 3 months (6 awards, most recently June 2025) — by that rhythm the next award was due around August 2025. The last award went to ASML Netherlands B.V..n = 6
- 31% of awards went to companies from abroad (300 awards with a known winner country). Sector average: 5%.n = 300
- 3% of this buyer's awards went to companies that had already won here before (300 awards since 2015, spread over 122 companies). 97% went to new names.n = 300 awards since 2015
- The median procedure drew 2 bids (253 procedures with a bid count); 42% ended with a single bidder. Sector: median 3 bids.n = 253
- 50% of the bids received came from small and medium-sized enterprises (10 procedures with a bid mix). Sector: 36%.n = 10
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.
Foreign bidders
In Netherlands · Repair & maintenance, 50 contracts went to foreign companies over the last 3 years (of 1,203 recorded awards) — mostly from Germany, France, Belgium.
Typical field: median 1 (from 3 awards).
What the buyer is looking for
The Assignment consists of the integral management and maintenance of the WCC and the associated installations. The estimated contract value for the maximum duration of eight years is approximately €12,000,000 excluding VAT. The maximum contract value for the entire term of the Agreement is 18.000.000, - excluding VAT.
Selection criteria — via the ESPD
The buyer states in the notice that eligibility is proven through the European Single Procurement Document (ESPD); the concrete requirements are in the tender documents. The document analysis below extracts them from there — bid and evidence in Dutch.
Eligibility analysis from the tender documents
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Bluefors Oy | 4 | 2023–2025 |
| Plassys-Bestek | 2 | 2024–2025 |
| FEI Europe B.V. | 2 | 2024–2026 |
| BAM Infra B.V. | 2 | 2024–2025 |
| Peer | 2 | 2024 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.