Development of Vallhamn industrial and business area
Utveckling av Vallhamns industri- och verksamhetsområde
Sweden · SKÄRHAMN · how to bid here →
Your path to submission
- Deadline: 5 October at 21:59 — 2 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: SWE.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- The median procedure drew 3 bids (32 procedures with a bid count); 9% ended with a single bidder. Sector: median 9 bids.n = 32
- 0% of this buyer's awards went to companies that had already won here before (43 awards since 2017, spread over 0 companies). That is well below the sector norm (13%) — this buyer switches suppliers more often than others.n = 43 awards since 2017
- 26% of awards went to companies from abroad (43 awards with a known winner country). Sector average: 12%.n = 43
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.
Foreign bidders
In Sweden · Architecture & engineering, 64 contracts went to foreign companies over the last 3 years (of 970 recorded awards) — mostly from Finland, Germany, Poland.
Typical field: median 9 (from 999 awards).
What the buyer is looking for
Tjörn municipality carries out procurement for development Vallhamn's industrial and operational area. The purpose of the project is to provide the municipality with attractive industrial and operational land for the establishment of companies, which contributes to more jobs and strengthened local and regional business development. Please note that this procurement is carried out in accordance with the Act (2016:1147) on the Procurement of Concessions, LUK. The procurement is carried out in several stages.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in Swedish.