Provision of energy services using the EPC method in the buildings of the Mining University – Technical University of Ostrava
Poskytování energetických služeb metodou EPC v objektech Vysoké školy báňské – Technické univerzity Ostrava
Czechia · Ostrava - Poruba · how to bid here →
Your path to submission
- Deadline: 5 October at 10:00 — 2 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: CES.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- 26% of this buyer's awards went to companies that had already won here before (609 awards since 2015, spread over 229 companies). That is well below the sector norm (77%) — this buyer switches suppliers more often than others.n = 609 awards since 2015
- In this sector the buyer awards roughly every 8 months (6 awards, most recently August 2026) — the next award is due around May 2027 by that rhythm. The last award went to ČECH - ENGINEERING, a.s..n = 6
- The median procedure drew just one bid (501 procedures with a bid count); 53% ended with a single bidder. Sector: median 4 bids.n = 501
- The award came in at a median 98% of the estimated value (209 awards with both estimate and value) — pricing at the estimate is usually about right here. Sector: 76%.n = 209
- 19% of awards went to companies from abroad (609 awards with a known winner country). Sector average: 8%.n = 609
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 02/10/2026.
Foreign bidders
In Czechia · Architecture & engineering, 449 contracts went to foreign companies over the last 3 years (of 15,807 recorded awards) — mostly from Germany, France, Austria.
Typical field: median 3 (from 5 awards).
What the buyer is looking for
As part of the contract, a proposal for energy-saving measures will be prepared by the service provider. The implementation of energy-saving measures within the meaning of this contract shall include the following operations: • preparation of project documentation and provision of other activities to secure building permits for the implementation of austerity measures if, according to the participant's offer, they are necessary with regard to the proposed measures and if the documents have not been provided by the contracting authority, • all engineering activities, in particular the processing of requirements related to obtaining a building permit, • preparation of implementation project documentation for the implementation of austerity measures, • delivery and installation of the proposed "turnkey" austerity measures, • energy management (services including permanent monitoring and…
Show full description
… evaluation of achieved energy savings) for the duration of the contractual relationship, including inspection of the installed equipment.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in Czech.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| SPECION, s.r.o. | 18 | 2024–2026 |
| Pragolab s.r.o. | 11 | 2024–2026 |
| Thein Systems a.s. | 8 | 2024–2025 |
| OptiXs, s.r.o. | 7 | 2024–2026 |
| Networksys a.s. | 6 | 2022–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.