VVN, V921/926 - obnova TR Vítkov-Tisová a VVN, V922/923 - obnova TR Vítkov-Tisová_PD
Czechia · Děčín - Děčín IV-Podmokly · how to bid here →
Your path to submission
- Deadline: 5 October at 10:00 — 2 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: CES.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (1178 awards, most recently July 2026) — by that rhythm the next award was due around September 2026. The last award went to Union Grid s.r.o..n = 1,178
- 39% of the bids received came from small and medium-sized enterprises (4,079 procedures with a bid mix). Sector: 92%.n = 4,079
- 73% of this buyer's awards went to companies that had already won here before (6,603 awards since 2015, spread over 468 companies). 27% went to new names.n = 6,603 awards since 2015
- The median procedure drew 5 bids (5,644 procedures with a bid count); 32% ended with a single bidder. Sector: median 4 bids.n = 5,644
- The award came in at a median 74% of the estimated value (16 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 76%.n = 16
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 02/10/2026.
Foreign bidders
In Czechia · Architecture & engineering, 449 contracts went to foreign companies over the last 3 years (of 15,807 recorded awards) — mostly from Germany, France, Austria.
Typical field: median 21 (from 1,151 awards).
What the buyer is looking for
The subject of the public contract is the preparation and transmission of complete implementation project documentation, including the budget in the budgeting software of the Contracting Authority and the relevant final legislative permit regarding the replacement and strengthening of existing 2x 110 kV lines under the designations V921/926 and V922/923 between the Vítkov transformer plant (PS/vnn) and the Tisová power plant (ETI). The precise definition of the subject of the contract and other requirements for its implementation, including information, conditions, specifications and other data, are specified in detail in the tender documentation.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in Czech.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| OMEXOM GA Energo s.r.o. | 108 | 2019–2026 |
| Elmoz Czech, s.r.o. | 90 | 2020–2026 |
| MSEM, a.s. | 83 | 2019–2025 |
| SEG s.r.o. · 32600 CZ | 82 | 2015–2026 |
| KAMAT spol. s r.o. | 80 | 2021–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.