Friedrich & ClementBETA

Energinet's qualification scheme for construction and civil works in turnkey contracts for 400 kV and higher

Energinets kvalifikationsordning for bygge- og anlægsarbejde i totalentreprise for 400 kV og højere

Denmark · Fredericia · how to bid here →

Your path to submission

  1. Deadline: 30 April 2030 at 10:00 — 1305 days left.
  2. The submission point is stated in the notice (link on the right).
  3. Offer and evidence in: DAN.
  4. Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

Clement What the numbers say about this buyer

  • 35% of awards went to companies from abroad (134 awards with a known winner country). Sector average: 3%.n = 134
  • 20% of this buyer's awards went to companies that had already won here before (134 awards since 2017, spread over 47 companies). 80% went to new names.n = 134 awards since 2017
  • 15% of the bids received came from other countries (28 procedures with a bid mix) — all bidders, not just the winners. Sector: 0%.n = 28
  • 2% of the bids received came from small and medium-sized enterprises (28 procedures with a bid mix). Sector: 34%.n = 28
  • The median procedure drew 3 bids (75 procedures with a bid count); 24% ended with a single bidder. Sector: median 4 bids.n = 75

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 02/10/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.

Foreign bidders

In Denmark · Construction work, 26 contracts went to foreign companies over the last 3 years (of 1,274 recorded awards) — mostly from Belgium, Germany, Bulgaria.

Typical field: median 4 (from 1,150 awards).

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

What the buyer is looking for

For the use of Energinet A/S's construction projects tendered out in turnkey contracts for station installations for voltage levels 400 kV and higher, this qualification scheme will be established. Projects offered under the scheme include projects where the main focus of the project relates to construction works at station installations for voltage levels 400 kV and higher. This means that construction works relating to voltage levels other than 400 kV and higher may occur to a lesser extent. The qualification scheme covers all activities related to the execution of turnkey contracts. Projects are implemented one or more at a time and the activities included in the category may include (but are not limited to) the following activities necessary to achieve turnkey projects: • Design of the task • Preliminary studies • Required authority involvement, permits • Construction site layout •…

Show full description

… Construction and terrain works • Raw house works • Installation works • Installation works • Inventory deliveries • Collaboration with contractors’ suppliers of technical equipment • Quality management • Construction management • Occupational health and environmental management • Sustainability management Categories: The qualification scheme comprises a total of 3 (three) categories with the following main characteristics: Category 1: New investment of station buildings for 400 kV and higher, in connection with international connections and major construction projects throughout Denmark Category 2: Re- or new investment of station buildings for 400 kV and higher in Eastern Denmark Category 3: Re- or new investment of station buildings for 400 kV and higher in Western Denmark For a detailed description of the categories, please refer to the 'Guide to qualification system' (23/12116-4). The applicant must submit an application per category and clearly state in the application the category to which the application relates. Language: The qualification scheme is established in Danish. However, tenders offered under this qualification scheme may be offered in both Danish and English.

Machine translation (EU eTranslation) — official wording via the PDF link.

What you must prove — eligibility criteria

›
Financial ratio required
For så vidt angår de finansielle nøgletal (såsom forholdet mellem aktiver og passiver), der er anført i den relevante meddelelse, i udbudsdokumenterne eller i ESPD, erklærer den økonomiske aktør, at de faktiske værdier for de nøgletal, der anmodes om, er som følger:
›
References: works
Kun for så vidt angår offentlige bygge- og anlægskontrakter: I referenceperioden har den økonomiske aktør udført følgende arbejder af den anførte type. Ordregivende myndigheder kan kræve op til fem års erfaring og tillade, at der tages hensyn til erfaring, som ikke er indhøstet inden for de seneste fem år.
Requirement texts are quoted in the notice's original language — the official wording is binding.

Contract

BuyerEnerginet
TypeWorks
Estimated valuevalue not published
Published27 August 2026
CategoryConstruction work · CPV 45000000

Who has won here before

CompanyAwardsPeriod
If Skadeforsikring, filial af If Skadeförsäkring AB142024–2026
P. Fournaise A/S32023
Zurich Denmark, Branch of Zurich Insurance Europe AG, Germany32026
P.L. Jessen ApS32023
Rambøll Danmark A/S · 2830 DK22026
From 18.0M documented awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this

20246
20251
20264

Who knows the rhythm prepares instead of reacting.

·
days until the deadline — Tuesday, 30 April 2030 at 10:00

How to bid

Read the full notice — Original + documents
Goes directly to this tender on TED — Tenders Electronic Daily. The full specification and all annexes are there.

Tender documents — direct download

Specifications and annexes hosted by the buyer — usually accessible without registration.
Friedrich finds tenders like this for you — every morning at 7:30, and he learns from your feedback.
Register now →