Control valves for quick-closing fittings for the main steam collector
Ovládacie ventily rýchločinných armatúr pre hlavný parný kolektor
Slovakia · Bratislava - mestská časť Ružinov · how to bid here →
Your path to submission
- Deadline: 5 October at 14:00 — 2 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: SLK, CES.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (18 awards, most recently July 2026) — by that rhythm the next award was due around September 2026. The last award went to Slovácke strojírny, a.s..n = 18
- The median procedure drew just one bid (182 procedures with a bid count); 55% ended with a single bidder. Sector: median 3 bids.n = 182
- 24% of this buyer's awards went to companies that had already won here before (213 awards since 2018, spread over 57 companies). 76% went to new names.n = 213 awards since 2018
- 45% of awards went to companies from abroad (213 awards with a known winner country). Sector average: 31%.n = 213
- 71% of the bids received came from small and medium-sized enterprises (104 procedures with a bid mix). Sector: 94%.n = 104
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.
Foreign bidders
In Slovakia, 786 contracts went to foreign companies over the last 3 years (of 15,945 recorded awards) — mostly from Czechia, Germany, Poland.
Typical field: median 2 (from 18 awards).
What the buyer is looking for
The subject of the contract is the supply of control valves of quick-acting valves for the main steam collector, spare parts of the initial equipment and the preparation of accompanying technical documentation. The detailed definition of the subject-matter of the contract, including the technical specifications, is annexed to these procurement documents – ‘Technical specification’.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in Slovak, Czech.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| VUJE, a.s. | 7 | 2024–2026 |
| EGEM, s. r. o. | 6 | 2024–2025 |
| PPA ENERGO, s.r.o. | 6 | 2025–2026 |
| Calmit, spol. s r.o. | 5 | 2024–2025 |
| VF, s.r.o. | 5 | 2024–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.