Territorial Study Southeast
Územní studie Jihovýchod
Czechia · Brno - Veveří · how to bid here →
Your path to submission
- Deadline: 5 October at 10:00 — 1 day left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: CES.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- 19% of this buyer's awards went to companies that had already won here before (437 awards since 2015, spread over 107 companies). That is well below the sector norm (78%) — this buyer switches suppliers more often than others.n = 437 awards since 2015
- In this sector the buyer awards roughly every 3 months (30 awards, most recently April 2026) — by that rhythm the next award was due around July 2026. The last award went to HRDLIČKA spol.s r.o..n = 30
- The median procedure drew 3 bids (365 procedures with a bid count); 28% ended with a single bidder. Sector: median 4 bids.n = 365
- The award came in at a median 86% of the estimated value (21 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 76%.n = 21
- 7% of awards went to companies from abroad (437 awards with a known winner country). Sector average: 8%.n = 437
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Czechia · Architecture & engineering, 449 contracts went to foreign companies over the last 3 years (of 15,807 recorded awards) — mostly from Germany, France, Austria.
Submission language: CES.
Typical field: median 4 (from 27 awards).
What the buyer is looking for
The subject of performance of the public contract is the elaboration of a territorial study pursuant to Section 67 et seq. of Act No 283/2021, the Construction Act, as amended.The subject of performance of the public contract is specified in more detail in the commercial and payment conditions (Annex 3 to the tender documentation) and in the technical specification (Annex 5 to the tender documentation).
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in Czech.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| OLMAN SERVICE s.r.o. | 16 | 2022–2026 |
| Aricoma Systems a.s. | 9 | 2024–2026 |
| HRDLIČKA spol.s r.o. | 6 | 2024–2026 |
| CZECH IMAGE GROUP s.r.o. | 5 | 2022–2026 |
| Diecézní charita Brno | 5 | 2015 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.