Compute, Storage and Backup 2 (CSB2)
Compute, Storage en Backup 2 ( CSB2)
Netherlands · Amersfoort · how to bid here →
Your path to submission
- Deadline: 19 October at 12:00 — 15 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: NLD.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- 4% of this buyer's awards went to companies that had already won here before (360 awards since 2015, spread over 174 companies). That is well below the sector norm (18%) — this buyer switches suppliers more often than others.n = 360 awards since 2015
- The median procedure drew 5 bids (332 procedures with a bid count); 12% ended with a single bidder. Sector: median 3 bids.n = 332
- 58% of the bids received came from small and medium-sized enterprises (180 procedures with a bid mix). Sector: 36%.n = 180
- 6% of awards went to companies from abroad (360 awards with a known winner country). Sector average: 8%.n = 360
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Netherlands · Office & computing machinery, 94 contracts went to foreign companies over the last 3 years (of 1,256 recorded awards) — mostly from Germany, France, Belgium.
Submission language: NLD.
Typical field: median 3 (from 1,055 awards).
What the buyer is looking for
a. Providing an on-premise storage and compute solution (S&C-infra) b. All hardware (ICT components) to be supplied as part of the ICT performance will become the property of the municipality of Amersfoort. c. Providing backup service for the on-premise environment with a minimum capacity of 523TB. d. Providing a backup service for the M365 environment. e. Maintaining and consulting the current M365 backup service data until 1 February 2030 f. Designing and setting up what is included under a, b,c and d; g. Implement the provisions of subparagraphs (a), (b), (c) and (d); h. The complete transition from the current environment to the new storage, compute and on-premise backup solution. i. Setting up and carrying out the management and maintenance with regard to the new storage, compute, on-premise backup. j. Setting up and carrying out the management and maintenance with regard to the…
Show full description
… M365 backup solution. - capacity for 300 virtual machines that have a minimum capacity of 8TB of memory (excluding SQL and Oracle cluster) - logical storage of at least 100TB - where the storage environment must be able to handle a peak load of at least 130,000 Read IOPS or 85,000 mixed IOPS - and the latency of the environment must not exceed 5ms round trip.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in Dutch.
Eligibility analysis from the tender documents
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| SIGHT Landscaping B.V. | 5 | 2024–2025 |
| Van Doorn Geldermalsen B.V. | 3 | 2024–2025 |
| Stichting De Tussenvoorziening | 3 | 2024–2026 |
| Florijn Aannemingsbedrijf B.V. | 3 | 2024–2026 |
| Nationale-Nederlanden Schadeverzekering Maatschappij N.V. | 2 | 2024–2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.