D1 Turany - Hubová, construction works
D1 Turany - Hubová, stavebné práce
Slovakia · Bratislava · how to bid here →
Your path to submission
- Deadline: 19 October at 10:00 — 15 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: SLK, CES.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every month (47 awards, most recently August 2026) — by that rhythm the next award was due around September 2026. The last award went to littlefinger, s.r.o..n = 47
- 18% of this buyer's awards went to companies that had already won here before (376 awards since 2018, spread over 100 companies). That is well below the sector norm (39%) — this buyer switches suppliers more often than others.n = 376 awards since 2018
- The median procedure drew 3 bids (336 procedures with a bid count); 15% ended with a single bidder. Sector: median 5 bids.n = 336
- The award came in at a median 82% of the estimated value (68 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 79%.n = 68
- 9% of the bids received came from other countries (165 procedures with a bid mix) — all bidders, not just the winners. Sector: 3%.n = 165
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Slovakia · Construction work, 80 contracts went to foreign companies over the last 3 years (of 1,102 recorded awards) — mostly from Germany, Czechia, Italy.
Typical field: median 4 (from 47 awards).
What the buyer is looking for
The subject of the contract is the construction of the motorway section D1 Turany — Hubová with a total length of 13.53 km, including the tunnels Korbeľka and Havran. In the proposed section of the motorway, there are a total of ten permanent bridge structures, four of which are directly on the motorway and two are ecoducts. In addition to permanent bridges, one more temporary bridge over the river Váh is designed from steel prefabricated structures, which is in temporary access routes during the construction of the highway. Support and frame walls are designed to eliminate land footage, ensure the stability of the D1 motorway body and protect against the effects of large waters. Within the D1 construction, 3 retaining walls and 2 frame walls are designed. The territory of the building passes through the lines of several above-ground and ground engineering networks - water supply, gas…
Show full description
… pipelines, high-current lines and distribution of HV, HV, NN, long-distance and local telecommunication lines and distribution. All affected lines will be relocated or protected to the extent induced by the construction in accordance with the requirements of individual administrators. On the end section of the D1 Turany — Hubová motorway, the proposed Švošov Management and Maintenance Centre is within accessible distance from the Hubová junction, accessible by a new bridge over the Váh River. The subject-matter of the contract is defined in detail in Volumes 1 to 5 of the tender specifications.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in Slovak, Czech.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Metrostav DS a.s. | 7 | 2024–2026 |
| Eurovia SK, a.s. · 040 17 SK | 6 | 2025–2026 |
| STRABAG s.r.o. | 5 | 2024–2026 |
| DOPRAVOPROJEKT, a.s. | 5 | 2026 |
| Valbek SK, spol. s r. o. | 5 | 2025–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.